My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11517 AIRPORT RD 2025-07-24
>
Address Records
>
AIRPORT RD
>
11517
>
11517 AIRPORT RD 2025-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 2:37:41 PM
Creation date
7/24/2025 1:54:10 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11517
Notes
STORMWATER SITE PLAN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> BMP C123: Plastic Covering <br /> Purpose Plastic covering provides immediate,short-term erosion protection to <br /> slopes and disturbed areas. <br /> Conditions of • . Plastic covering may be used on disturbed areas that require cover <br /> Use measures for less.than 30 days,except as stated below. <br /> • Plastic is particularly useful for protecting cut and fill slopes and <br /> stockpiles. Note:The relatively rapid breakdown of most polyethylene <br /> sheeting makes it unsuitable for long-term(greater than six months) <br /> • <br /> applications. <br /> • Clear plastic sheeting can be used over newly-seeded areas to create a <br /> greenhouse effect and encourage.grass growth if the hydroseed was <br /> installed too late in the season to establish 75 percent grass cover,or if <br /> the wet season started earlier than normal. Clear plastic should not be <br /> • used for this purpose during the summer months because the resulting <br /> high temperatures can kill the grass. <br /> • Due to rapid runoff caused by plastic sheeting,this method shall not be <br /> used upslope of areas that might be adversely,impacted by <br /> concentrated runoff. Such areas include steep and/or unstable slopes. <br /> • While plastic is inexpensive to purchase,the added cost of installation, <br /> maintenance,removal,and disposal make this an expensive material, ( <br /> up to.$1.50-2.00 per square yard. <br /> • Whenever plastic is used to protect slopes,water collection measures <br /> must be installed at the base of the slope. These measures include <br /> plastic-covered berms, channels,and pipes used to covey clean <br /> rainwater away from bare soil and disturbed areas. At no time is clean <br /> runoff from a plastic covered slope to be mixed with dirty runoff from <br /> a project. <br /> •. Other uses for plastic include: <br /> 1. Temporary ditch liner; <br /> 2.: Pond liner in temporary sediment pond; <br /> 3. Liner for bermed temporary fuel storage area if plastic is not .. <br /> reactive to the type of fuel being stored; <br /> 4. Emergency slope protection during heavy rains;and, <br /> 5. Temporary drainpipe("elephant trunk")used to.direct water. <br /> • 4-26 Volume ll—Construction Stormwater Pollution.Prevention February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.