Laserfiche WebLink
A Portion of Section 18,Township 28 North, Range 05 East,W.M. <br /> BMP'S TO BE APPLIED AS APPROPRIATE <br /> o BMP's: C101 Preserving Natural Vegetation I" <br /> C105 Stabilized Construction Entrance <br /> C120 Temporary&Permanent Seeding LLi <br /> C121 Mulching z rh <br /> Temporary Amended C 123 Plastic Covering N <br /> Soils Stockpile Area C 140 Dust Control o0"N <br /> C 150 Materials on Hand m a o^ <br /> C151 Concrete Handling > N <br /> C153 Material Delivery,Storage and Containment -a a <br /> C160 Certified Erosion&Sediment Control Lead F�� <br /> �\ C220 Storm Drain Inlet Protection �# o c m <br /> C233 Silt Fencing N Q <br /> C234 Vegetated Strip <br /> C235 Straw Wattles <br /> XY x <br /> NOTE: <br /> C151 -Concrete Washout Area designated in <br /> centralized location. <br /> i Confirm location with Superintendent on site, v <br /> t <br /> 54M 6SC bG'SS VOL-1 <br /> CONSTRUCTION SWPPP Sorfivtt ;? <br /> The e'�ements that are part of a Construction SWPPP are as follows: <br /> � � Q <br /> 1. Mark Clearing Limits:Prior to clearing or disturbing the limits must be marked.This element is <br /> j 6 i part of most normal construction plans as one of the first steps. <br /> 5 i 2. Establish Construction Access:All erosion control plans shall instal a stabilized construction d V Z ' p <br /> r X entrance(or other method of preventing sediment transport onto the roads).If a standard W 3 w <br /> i gravel construction entrance is proposed,use geo-textile fabric under the rock.Note:a _�a <br /> wheel wash is required for plans that propose winter grading. a a 0 0 W <br /> C 140 <br /> 3. Detain Flows:Based on a downstream analysis it may be necessary to detain runoff from a 3 <br /> i C 150 site under construction.It may be necessary to construct and use a detention pond to 2 <br /> control flows during construction. o <br /> X 4. Install Sediment Controls:If there ls runoff from the construction site,sediment shag be <br /> removed from the water.Note that the water quality standards must be met. Q t <br /> _ 3 C <br /> 5. Stabilize Soils:All exposed and non-worked sod shag be stabT¢ed by use of BMP's.Note a, Zo <br /> there ore time periods of allowed exposure that depend on the season.Groundcover = N <br /> both temporary and permanent need to be pe part of the construction plans. p w y <br /> ^` N C <br /> Construct Stabilized Temporary _ i \ I6 6. Protect Slopes:Cut and fill slopes need to be protected from erosive flows and N a 17 <br /> Construction Entrance per City of - - -- - - -- -- <br /> concentrated flows until permanent cover and drainage conveyance systems are in <br /> 9 _ 1� place. <br /> Everett Std Dw U 201 � <br /> �o._,�>- c>�, cs fin_ ,�� o• d <br /> C 105 j_, , `" �� 7. Protect Drain Inlets:NI storm drain inlets requie protection from sediment and silt laden o <br /> — - . - - - - - - - -- - - - - - - - < water. <br /> o <br /> SSCO - Ex.Mete; _- . - 8. Stabilize Channels and Outlets:Temporary and permanent conveyance systems shag be a <br /> - - �� �� - - _ _ stabilizedto prevent erosion during and after construction.Culvert outle <br /> ts requ're <br /> c°� LLJ <br /> ) !-1 ( i 1 < protection. o F- <br /> W .�_ ——— Vl—1— t—— 114 _— \Y——— <br /> 9. Control Pollutants:The plan shall show how al pollutants,including waste materials and 3 <br /> fV)C;?! L)Gt demolition debris,will be handled.This includes maintenance of construction equipment, _J O <br /> fertilize51" rs,apprication of chemicals,and water treatment systems. <br /> o < J <br /> ca <br /> ___ ___„ ___ j��{l�, > « _ _ __=, _ _- 10. Control De-Watering:The water from de-watering systems for trenches,vaults and o <br /> ss- --S_--- < ,-- --5 ---< C) o <br /> �-f �� )`,t / - = foundations shag be discharged into a controlled system. <br /> 11. Maintain BMPs:The Ian shag provide for inspection and maintenance of the p pr pe planned and <br /> G <br /> o _ � <; installed construction BMPs as well as Their removal at the end of the project.-Ex,4-StYhsZ71 70 <br /> t <br /> �]� !1_ - - — 12. Manage the Project:The plan shall outline how the site shag be managed for erosion a, <br /> t control and identify the management team.It needs to cover h <br /> so---,p__ 220 fy g phasing,training, .0 , <br /> -`D---` pre-construction conference,coordination with utilities and contractors,monitori and W <br /> _Sn___cp---so--- _ <br /> o •p___sD---sD-- reporting.It shall provide for notice of problems,revisions during construction and U r <br /> ___cD___Ip——_c <br /> o _ conti ens planning.One of the most important g ng y pl ng. portant elements in the management of the r1 m <br /> Aisle A project is planning for contingencies based on the risk of exposure during phases of the <br /> E - __ _. _ -- development.It is essential that planning is ongoing throughout the rife of the project. <br /> o <br /> v ` 13. Protect on-Site stormwater management BMPs for runoff from roofs and other C3 S a or C4 <br /> ..9 hard surfaces.On-site Stormwater Management BMPs shall be protected at all <br /> 0 0 10, times during the construction process.This may mean that stormwater „x„ <br /> =o --_ _ _ _ - management BMPs will be installed towards the end of the construction process <br /> LOT 1 TESC PLAN — - _ -- — Scale: 1"=10' to avoid siltation and compaction. <br />