Laserfiche WebLink
PACE <br /> An Engineering Services Company- <br /> TABLE OF CONTENTS <br /> Section 1 — Project Overview 1 <br /> 1.1 General Description 1 <br /> 1.2 Site Assesment 2 <br /> Section 2 —Minimum Requirement 1 3 <br /> 2.1 Stormwater Site Plan Preparation 3 <br /> Section 3 — Minimum Requirement 2 3 <br /> 3.1 Construction Stormwater Pollution Prevention 3 <br /> Section 4 — Minimum Requirement 3 5 <br /> 4.1 Source Control of Pollution 5 <br /> Section 5 — Minimum Requirement 4 6 <br /> 5.1 Preservation of Natural Drainage Systems and Outfalls 6 <br /> Section 6—Minimum Requirement 5 6 <br /> 6.1 On-site Stormwater Management 6 <br /> Section 7 —Special Requirements 8 <br /> 7.1 Public Works Policy#2-11 8 <br /> 7.2 Existing Land Cover Conditions 10 <br /> 7.3 Proposed Land Cover Conditions 11 <br /> 7.4 Flow Control System 12 <br /> List of Appendices <br /> Appendix A— Existing and Proposed Land Cover Exhibits <br /> Appendix B — Geotechnical Report <br /> Appendix C—Small Parcel Erosion and Sediment Control Plans and BMPs <br /> Appendix D— Source Control Activity Worksheet and BMPs <br /> Appendix E — Flow Control Calculations <br /> List of Figures <br /> Figure 1 —Site Location Map 1 <br /> Figure 2—Aerial Photograph 2 <br /> Figure 3—Aerial Photograph #2 10 <br /> List of Matrices <br /> Matrix 1 — Existing Onsite Land Cover 11 <br /> Matrix 2— Existing Offsite Run-On Land Cover 11 <br /> Matrix 3— Proposed Area to Tank 11 <br /> Matrix 4-Proposed Area Bypassing Tank 12 <br /> Matrix 5— Detention Tank Parameters 12 <br /> Starbucks Page i <br /> Broadway and 10th Store <br /> Drainage Report <br />