My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3523 BROADWAY 2025-07-24
>
Address Records
>
BROADWAY
>
3523
>
3523 BROADWAY 2025-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2025 3:55:07 PM
Creation date
7/24/2025 3:54:45 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3523
Notes
STORMWATER SITE PLAN REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT STORMWATER MANAGEMENT MANUAL <br /> Required BMPs <br /> The following BMPs or equivalent measures are required of all businesses engaged in building repair, <br /> remodeling,and construction: <br /> 1. Employees must be educated about the need to control site activities to prevent stormwater <br /> pollution,and also trained in spill cleanup procedures. <br /> 2. Spill cleanup materials,appropriate to the chemicals being used on site, must be available at the <br /> work site at all times. <br /> 3. The work site must be cleaned up at the end of each workday,with materials such as solvents put <br /> away indoors or covered and secured so that vandals will not have access to them. <br /> 4. The area must be swept daily to collect loose litter,paint chips,grit,and dirt. <br /> 5. Absolutely no substance can be dumped on pavement,on the ground,or in or toward storm <br /> drains,regardless of its content,unless it is water only. <br /> 6. For wood treating activities drop cloths must be placed where space and access permit before the <br /> work begins. Additional drip pans must be used in areas where drips are likely to occur that <br /> cannot be protected with a drop cloth. <br /> 7. Ground or drop cloths must be used underneath scraping,sandblasting work. Ground cloths, <br /> buckets,or tubs must also be used anywhere that work materials are laid down. <br /> 8. Incidental cleaning of paint brushes and other tools that are covered with water-based paints must <br /> be cleaned in sinks connected to sanitary sewers or in portable containers that can subsequently <br /> be dumped into a sanitary sewer drain. Brushes and tools covered with non-water-based finishes <br /> or other materials must be cleaned in a manner that enables collection of used solvents for <br /> recycling or proper disposal and cannot be discharged to the sanitary sewer. See BMP S.2 in <br /> Chapter 4 for disposal options. <br /> 9. Storm drain covers or similarly effective devices must be used if dust,grit,washwater,or other <br /> pollutants may escape the work area. This is particularly necessary on rainy days. The cover or <br /> containment device shall be placed over the storm drain at the beginning of the workday,and <br /> accumulated dirty runoff and solids must be collected and disposed of before removing the cover <br /> at the end of the day. <br /> Suggested BMPs <br /> The following BMPs are not required, but can provide additional pollution protection: <br /> 1. Materials should be recycled whenever possible. <br /> 2. Light spraying of water on the work site can control some of the dust and grit that can blow away. <br /> Oils must never be used for dust control. Never spray to the point of runoff from the site. <br /> 3. Activities such as tool cleaning should occur over a ground cloth or within a containment device <br /> such as a tub. <br /> Volume IV—Source Control <br /> 3-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.