Laserfiche WebLink
Stormwater Site Plan Report <br /> CG Project#13017.20 <br /> Chapter II — Site Assessment <br /> Chapter II Summary <br /> Narrative <br /> Site Survey(11 x17) <br /> Sail Maps <br /> This report includes the survey drawing of the site,showing the land features and topography. <br /> The area of work is bordered by additional car wash property(the self-serve stalls)on the <br /> north, an alleyway on the east, 36th Street on the south, and Broadway Ave on the west.The <br /> site is generally level with the adjacent right of ways, and is separated from the alleyway by a 2' <br /> tall rockery. <br /> Soil Maps are provided in this section of the report. <br /> There are no critical areas on the site. <br /> The site slopes from west to east at approximately 1%to 3%.The existing storm drainage on <br /> the site flows into catch basins,which then convey storm water toward a storm main in the <br /> alleyway,which is located approximately 2' lower than the site. <br /> 250 4th Ave South,Suite 200 <br /> C0 Edmonds, WA 98020 <br /> ENGINEERING <br />