Laserfiche WebLink
I <br /> ITABLE OF CONTENTS <br /> I 1.0 PROJECT DESCRIPTION 1 <br /> 2.0 DESIGN CRITERIA AND ASSUMPTIONS 1 <br /> 2.1 Governing Guidelines 1 <br /> I 2.2 Design Criteria 2 <br /> 2.3 Design Assumptions 2 <br /> 3.0 BASIN ANALYSIS 4 <br /> I 3.1 Soil and Curve Number Information 4 <br /> 3.2 Predevelopment Condition 4 <br /> 3.3 Post-Development Condition 4 <br /> I 4.0 OFF-SITE ANALYSIS REPORT 5 <br /> 4.1 Task 1: Study Area Definition 5 <br /> 4.2 Task 2: Review of Available Information 5 <br /> I 4.3 Task 3: Field Inspection 5 <br /> 5.0 SUMMARY OF MINIMUM DEVELOPMENT REQUIREMENTS 6 <br /> 5.1 Minimum Requirement#1:Preparation of Stormwater Site Plans 6 <br /> I 5.2 Minimum Requirement#2: Construction Stormwater Pollution Prevention(SWPP) 6 <br /> 5.3 Minimum Requirement#3: Source Control of Pollution 6 <br /> 5.4 Minimum Requirement#4: Preservation of Natural Drainage Systems and Outfalls 6 <br /> 5.5 Minimum Requirement#5: On-Site Stormwater Management 6 <br /> I <br /> 5.6 Minimum Requirement#6:Runoff Treatment 7 <br /> 5.7 Minimum Requirement#7: Flow Control 8 <br /> 5.8 Minimum Requirement#8: Wetlands Protection 8 <br /> I 5.9 Minimum Requirement#9:Basin/Watershed Planning 8 <br /> 5.10 Minimum Requirement#10: Operation and Maintenance 8 <br /> Appendices <br /> Appendix A Figures 1-4&Site Photos <br /> I Appendix B Soils Information <br /> Appendix C StormShed&WWHM3 Results <br /> Appendix D Interim Stormwater System for North Basin <br /> IAppendix E Stormwater Facilities Operations and Maintenance Manna! <br /> I <br /> I <br /> I. <br /> P:\D\DYKM00000002\0600INFO\0670Reports\DYKM02DrgRpt_6-3-10.doc <br /> '. DAVID EVANS AND ASSOCIATES,INC. <br /> OPERATIONS CENTER ADDITION JUNE,2010 <br /> STORMWATER SITE PLAN PAGE I <br />