Laserfiche WebLink
Administration Building Office Expansion Everett,Washington <br /> Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if <br /> provided, and any attachments are only a copy of the original document. The original document is stored by <br /> GeoEngineers, Inc.and will serve as the official document of record. <br /> Please refer to Appendix D, titled "Report Limitations and Guidelines for Use" for additional information <br /> pertaining to use of this report. <br /> REFERENCES <br /> GeoEngineers, 2009. "Geotechnical Engineering Services, Proposed Pole Storage, Operations Center, <br /> Snohomish County PUD No. 1, Everett,Washington",dated June 10,2009. <br /> 1 Hart Crowser, 1989. "Geotechnical Engineering Design Report,Snohomish County PUD No. 1,Office Building <br /> Addition, Everett,Washington",dated October 10, 1989. <br /> International Code Council,2009, International Building Code. <br /> Smith, Mackey (1976). "Preliminary Surficial Geologic Map of the Mukilteo and Everett Quadrangles, <br /> Snohomish County, Washington." State of Washington, Department of Natural Resources, Geologic <br /> Map GM-20. <br /> U.S. Geological Survey, "Earthquake Hazards Program, Interpolated Probabilistic Ground Motion for the <br /> Conterminous 48 States by Latitude Longitude, 2002 Data," accessed using Earthquake Ground <br /> Motion Parameters Java Program Version 5.0.9 on October 13, 2009. <br /> ' WSDOT,2008,Standard Specifications for Road, Bridge and Municipal Construction. <br /> f <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> I <br /> GEOENGINEERS October30,2009 Page 13 <br /> File No.0482-031-02 <br />