My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 CALIFORNIA ST Geotech Report 2025-07-25
>
Address Records
>
CALIFORNIA ST
>
2320
>
Geotech Report
>
2320 CALIFORNIA ST Geotech Report 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 8:16:21 AM
Creation date
7/25/2025 8:14:39 AM
Metadata
Fields
Template:
Address Document
Street Name
CALIFORNIA ST
Street Number
2320
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> < <br /> I 6 <br /> cr, a. <br /> E EXTERIOR WALL <br /> a SLOPED TO DRAIN <br /> I <br /> z AWAY FROM STRUCTURE <br /> � <br /> Nx�, <br /> x =IEIII . <br /> PAVEMENT OR 24" '���/i�/ �ICI I AIL=III ��-� 4}IF WALL DRAINAGE MATERIAL <br /> itli 4 <br /> IMPERVIOUS SOIL �i�� — I I-1I1=1I l�•,•: <br /> \\ I I = —ME—6`41 <br /> o ;" 11=1 11— Pt y t <br /> N RETAINED SOIL /j III 111l11 I11 p!. 2 MIN. <br /> o IIIIII=.'41,':F= DAMP PROOFING <br /> TEMPORARY =I11=I111 {� <br /> EXCAVATION SLOPE 11=III=Pr••• yKt. VAPOR RETARDER <br /> 11 =111ig ' <br /> _ •���1•s"s7 <br /> =II ,,„- :�i ' FLOOR SLAB <br /> a di i t.orliiv <br /> m ►�=•.�::i•�: 4„ MIN. <br /> I12" MIN. COVER OF \/i��//, •\'\�//��//\�\// <br /> DRAINAGE MATERIAL — CAPILLARY BREAK <br /> (6" MIN. ON SIDES OF PIPE) 4" DIAMETER <br /> PERFORATED <br /> M DRAIN PIPE <br /> a) <br /> I6 NOT TO SCALE <br /> E <br /> 0 <br /> z <br /> 0 <br /> Materials: <br /> J <br /> A.WALL DRAINAGE MATERIAL: May consist of washed 3/8"to No.8 pea gravel.Alternatively the wall drainage <br /> material may consist of"Gravel Backfill for Drains"per WSDOT Standard Specification 9-03.12(4),surrounded with a <br /> Inon-woven geotextile such as Mirafi 140N(or approved equivalent). <br /> B. RETAINED SOIL:Should consist of structural fill,either on-site soil or imported.The backfill should be compacted in <br /> loose lifts not exceeding 6 inches.Wall backfill supporting building floor slabs should consist of imported sand and gravel <br /> I per WSDOT Standard Specification 9-03.14 or City of Seattle Type 17 compacted to at least 95 percent ASTM D1557. <br /> Backfill not supporting building floor slabs,sidewalks,or pavement should be compacted to 90 to 92 percent of the <br /> maximum dry density, per ASTM D1557. Backfill supporting sidewalks or pavement areas should be compacted to at <br /> M least 95 percent in the upper two feet. Only hand-operated equipment should be used for compaction within 5 feet of the <br /> Io walls and no heavy equipment should be allowed within 5 feet of the wall. <br /> M) <br /> o C.CAPILLARY BREAK:Should consist of at least 4 inches of clean crushed gravel with a maximum size of 1-1/2 inches <br /> I <br /> m and negligible sand or fines. - <br /> 0 • <br /> o D. PERFORATED DRAIN PIPE:Should consist of a 4-inch diameter perforated heavy-wall solid pipe(SDR-35 PVC)or <br /> 6 rigid corrugated polyethylene pipe(ADS N-12)or equivalent.Drain pipes should be placed with 0.5 percent minimum <br /> I / slopes and discharge to the storm water collection system. <br /> N <br /> O <br /> 7 Wall Drainage and Backfill <br /> o <br /> o Administration Building Office Expansion <br /> Everett, Washington <br /> I / <br /> GEOENGINEERS...0 Figure 3 <br /> w <br /> Ld <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.