Laserfiche WebLink
I <br /> ITable of Contents <br /> IINTRODUCTION 1 <br /> Project Description 1 <br /> Purpose and Scope 1 <br /> IFIELD EXPLORATION AND LABORATORY TESTING 1 <br /> Field Explorations 1 <br /> I Previous Studies 1 <br /> Laboratory Testing 1 <br /> SITE CONDITIONS 2 <br /> I Surface Conditions 2 <br /> Geology 2 <br /> S C 2 <br /> I Groundwater <br /> ubsurface Conditions 2 <br /> CONCLUSIONS AND RECOMMENDATIONS 2 <br /> I Summary of Key Geotechnical Issues 2 <br /> Earthquake Engineering 3 <br /> 2009 IBC Seismic Design Information 3 <br /> Liquefaction 3 <br /> I Shallow Foundations 3 <br /> Allowable Bearing Pressure 4 <br /> Settlement Estimates 4 <br /> I Foundation Design 4 <br /> Lateral Resistance 4 <br /> Construction Considerations 4 <br /> I Footing Drains 5 <br /> Slab on Grade Floor 5 <br /> Subgrade Preparation 5 <br /> Design Parameters 5 <br /> I Pavement Recommendations 6 <br /> Subgrade Preparation 6 <br /> New Hot Mix Asphalt(HMA)Pavement 6 <br /> I Portland Cement Concrete Pavement 6 <br /> Asphalt-Treated Base 6 <br /> Earthwork 7 <br /> Clearing and Site Preparation 7 <br /> I Subgrade Preparation 7 <br /> Structural Fill 8 <br /> Excavation 9 <br /> I Temporary Cut Slopes 10 <br /> Utility Trenches 10 <br /> Sedimentation and Erosion Control 11 <br /> I Stormwater Detention Pond 11 <br /> General 11 <br /> Soil Conditions 11 <br /> Permanent Slopes 11 <br /> I Erosion Control 11 <br /> Infiltration Considerations 12 <br /> Recommended Additional Geotechnical Services 12 <br /> I <br /> GEOENGINEERS Page 30,2009 Pa e i <br /> File No.0482-031-02 <br /> I <br />