Laserfiche WebLink
r ) <br /> Section 02570 <br /> SYNTHETIC TRACK SURFACING-SPURTAN BS SPECIFICATION <br /> PART 1-GENERAL <br /> 1.01 SUMMARY <br /> A.The contract work to be performed under this section consists of furnishing ail <br /> required labor, materials, equipment, implements, parts and supplies <br /> necessary for,the surfacing in accordance with these specifications and <br /> indicated on the drawings. <br /> 1. Spurtan BS-Polyurethane bound running track surface with structural <br /> spray finish <br /> 1.02 CODES AND STANDARDS <br /> A Codes and standards follow the current guidelines set forth by the <br /> International Associations of Athletics Federation(IAAF),the National <br /> Collegiate Athletic Association (NCAA)or the National Federation of State <br /> High School Associations(NFHS). <br /> 1.03 SUBMITTALS AND SUBSTITUTIONS <br /> A Request for deviations or substitutions from the specifications must be made <br /> in writing seven days prior to the bid date. Complete product data including <br /> specifications, application rates, mixing instructions and a sample shall be <br /> sent with the request to the district and/or its agent for an evaluation. <br /> Alternatives will be allowed only by addendum. <br /> 1. Submit three(3)sets of manufacturer's product data sheets including <br /> installation guidelines and maintenance instructions <br /> Advanced Polymer Technology <br /> 109 Conica Lane• PO Box 160•Harmony PA 16063 <br /> 724-452.1330•www.advoolvtech.com <br />