Laserfiche WebLink
Table 1: Impervious Area Calculations <br /> Existing Impervious Proposed Permeable Proposed Impervious Area <br /> Areas(sf) Surface(sf) Impervious Area Reduction from <br /> with LID Credit(sf) Existing Conditions <br /> (sf) <br /> 46,394 65,746 32,873 13,521 <br /> Based on Table 1, there is a 13,521 square-foot reduction in impervious areas from existing to <br /> proposed conditions. Subsequently, the project is not subject to Minimum Requirements #6 <br /> through#9 since the following thresholds have not been exceeded: <br /> • Creates or adds 5,000 square feet or more of new, replaced, or total of new plus replaced <br /> pollutant generating impervious surfaces. <br /> • Creates or adds 5,000 square feet or more of new impervious surfaces. <br /> • Converts'/4 acres,or more,of native vegetation to lawn or landscape areas. <br /> • Converts 2.5 acres,or more,of native vegetation to pasture. <br /> The project is subject to Minimum Requirements #1 through #5 based on the following <br /> thresholds: <br /> • Creates or adds 2,000 square feet, or greater, of new, replaced, or total of new plus <br /> replaced impervious surface area. <br /> • Has land-disturbing activity of 7,000 square feet or greater. <br /> 3.2 Minimum Requirements <br /> 3.2.1 M.R.#1 —Storm water Site Plan Preparation <br /> The Construction Documents include both existing and proposed drainage plans with <br /> associated grading (See Appendix B). The Stormwater Site Plan also includes the <br /> contents of this report. <br /> 3.2.2 M.R.#2— Construction Storm water Pollution Prevention <br /> The project will incorporate erosion and sedimentation control systems to address <br /> specific site conditions during construction in accordance with the 2010 Stormwater <br /> Management Manual. Because more than 1 acre of area will be disturbed, a <br /> Construction Stormwater General Permit will be obtained from the Washington State <br /> Department of Ecology. Perimeter control of the construction area will be provided <br /> using silt fencing to reduce the risk of sediment transport into adjacent roads and <br /> neighboring downstream properties. Ground cover measures and sedimentation tanks <br /> are also incorporated into the erosion control design. The full erosion and sediment <br /> Technical Information Report <br /> Cascade High School—Track Replacement Project 3 Integrityworks Consulting Engineers,LLC <br /> Project No.212104 <br />