Laserfiche WebLink
- --- <br /> POR. NW 1/4, S 14, T 28 N, R 4 E, W.M. 0 10' 20 40' 80' .-...,. <br /> I- --.- .- •-•-:-_-- _.=,---.•7•- -- ----,.='. <br /> RIM t,,./ ./.. 7 / ,/ --L-L-- <br /> CR. OF CHANNEL ' "----- / // / /_ / ' • <br /> 4' . <br /> 8CONC(N15.)1E=537.53 ------..- -J0,/ / •//2 HOR.SCALE:1"-=20' (1:240) <br /> / •'.:// . -'-/---.‘'R:17A°E.5L'"74 1 1;1E 1 L 0 T 1 ,• <br /> , <br /> / . / <br /> ,-,• - / 12"CONC(NE)1.-2=537.08 NORTH Abossein <br /> 'TLU 1.2"coNc(swg=536.73 . <br /> CB #5072. TYPE I --------"---";/ 'Ca .z• , ! <br /> RIM EL=.5. 1.28 / / q.'//.--". Engineering, <br /> 2"CONC(S/E)IE=536.32// 4/ / '...lei/ <br /> /k / / P/// -.111r'v L.L.C. <br /> / , ,, // ////' / /, '.'s. / / . <br /> / ESCP STANDARD CITY NOTES <br /> / „/ , / <br /> /-, <br /> , ECHANICAL-MICA <br /> 9.1DPL,/ 4, • // / 1 A. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS SHALL BE FLAGGED <br /> I 4 / FOR EASY IDENTIFICATION BEFORE CLEARING TAKES PLACE.AFTER THESE AREAS CIVIL <br /> - AV <br /> / i , / t). \i/e 7. / / STOCKPILE AREA <br /> 7.3s.46,.1:1*6"CY,12,,F. / I I 1 i ARE FLAGGED AND CLEARING LIMITS ARE APPROVED,AN AREA WIDE ENOUGH TO FIRE PROTECTION <br /> / I / / / / y/M FOR BMP'S <br /> / / o INSTALL A SILT FENCE AT THE CLEARING LIMITS,BY HAND OR BY MECHANICAL <br /> 2100 112TH AVE.NE <br /> iNT 0 • ' 0 0 /.//4, ,7,,,? EMERGENCY REPAIR v- I <br /> u-, 1 11 METHODS,MAY BE CLEARED.THE TOP OF THE SILT FENCE SHALL BE REFLAGGED <br /> r L <br /> pC,6 0.2 <br /> , ,,, <br /> 4. 1 <br /> CB #5071, TYPE I / 1 , <br /> // , c• <br /> SILT SACK STORM <br /> ////..., 04 pv ^ __ 739.36' <br /> / . ' ,1::... ., INLET PROTECTION // 1 1 i AFTER INSTALLATION.IF A SILT FENCE IS NOT REQUIRED,THE AREA SHALL BE <br /> DELINEATED USING AN ORANGE BARRIER. BUM, IA 98004 <br /> PH:(425)462-9441 <br /> BIM EL=541.03 <br /> 12"CONC(VS)IE=535.97/ // A. / • <br /> ti 8 <br /> ll i B. ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, <br /> OPERATIONAL,AND INSPECTED BY THE PUBLIC WORKS INSPECTOR PRIOR TO FAX: (425)462-9451 <br /> 8 0 4" / /,r.,4T /1 , <br /> " -." IP <br /> * --,- <br /> _- -_ I, INITIATION OF CLEARING AND GRUBBING OPERATIONS. <br /> C. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING B-14:cservitelimmin.com <br /> Inmabossein.com <br /> / / 0 , / BOTH THE DEVELOPER AND PUBLIC WORKS INSPECTOR.NO TREES SHALL BE <br /> y 1.1 / / / _ NAARTEAIVETOCOBNEIFE <br /> / INTERPLANTEDRS WITR-I /";):// / REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES. <br /> D. WHERE POSSIBLE,NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION -- --- --- <br /> CD /I <br /> 1 2/.;/./ . <br /> .. / / • • <br /> ''' 1/4./ - I 6-/C• . •//j <br /> 4 / <br /> ,,,,..//1 / <br /> . /,->"/ // z/ // <br /> /,/z / .40-...‘%...Z SEE LANSCAPING PLANS <br /> I // /i 1 <br /> ----, I // / 11 AND SEDIMENT CONTROL. <br /> E. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE,THE <br /> EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS <br /> '4'''',4 / REQUIRED TO ENSURE CONTINUING EROSION/SEDIMENT CONTROL. <br /> CB #5070, TYPE I /1 , / 0. <br /> RIM EL=541.19 / / / 1 7'7 7,.,‘ / 7/ I il '21 / F. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED <br /> 12"CONC(N/B)1E=535.2e / / <br /> w / N.... 4. IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR <br /> ,// I////,. •/ / \ 14..... / 105'WETLAND___L.__ /' , / <br /> / / 1/// 34i <br /> / / / ,. BUFFER(TYP) 'N' / r 1/2',,j/ 1 "F...... CONSTRUCTION IS COMPLETED,PERMANENT DRAINAGE FACILITIES ARE <br /> -40. 4*.- 1.11 fl OPERATIONAL,AND THE POTENTIAL FOR EROSION HAS PASSED. <br /> ' / // G. AT A MINIMUM,EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE <br /> CB #5069, TYPE I // --..> <br /> , /,.// / N /19.140111? L <br /> -.. <br /> RIM EL=541.21 4,', /'. . / ,..".....0..' SILT SACK STORM // OT 2 -,..., 4"CANN.,,si /I/ MAINTAINED MONTHLY,OR FOLLOWING EACH RUNOFF-PRODUCING STORM,TO <br /> , ,,0 <br /> 12"CONC(N)IF.=534.21 /f .. 1 ///. 4.4citei/ INLET PROTECTION / I <br /> I ENSURE PROPER OPERATION OF ALL EROSION AND SEDIMENT CONTROL <br /> ...9r-4...-.Pr- 1lb. / FACILITIES.SSMH #2 / 0,,./..'/ / , - L,'. 11,44%14,41W,(0 .,, <br /> 'I <br /> H.' ( <br /> RIM EL=543.23 I .gir..tex...or-..t.7,.. <br /> 4 Oa;WV: -, / H. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN,SIZE, <br /> i'N / 1 "S I <br /> CTR. OE CHANNEL / / / Ct " 4' ';.- 71r-1---1.' /.-*" 105'WETLAND BUFFER ) NOR LOCATION OF PERMANENT PIPES,RESTRICTORS,OR DETENTION FACILITIES; <br /> 8"CONC(NE/SW)IE=535.01 I / , . G• ' :''''.11.411f N : // 's\ I I BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMPS ONLY. b.!) <br /> 8"CONC(NW)IE=535.01 <br /> I TEMPORARY CONSTRUCTION <br /> ENTRANCE AND TIRE WASH . - If <br /> °- -'''',..111-•••'04-' ' / ---- ---,/ I <br /> / . I I. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN.TRACKING OF MUD AND DEBRIS '0 <br /> 1,01'AV:46,Z.' 4 J. <br /> . TFRHOEMwTAsHEHISNIGTTE0WNILSLTNAOTETCBLEEAALNLOAIWREADC.TFARIELQUURIERTEOS TCHOEMLIPSLYEWOFITHALTLHKISNOCOWNND,CONDITION r-I <br /> 1 '''-'; PER CITY DETAIL 208 \ , , , ---/ .,,,. ,-, <br /> 14 N.41161' ---1- N 57'39'46" W / / _____I/ WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED. <br /> PUMP <br /> ilk. I./ / i'" .' Y <br /> /..,1•41;411, /NAM,' // , <br /> ' 4 191.61' -7- -.. <br /> HOUSE /' ® ', k I / AVAILABLE,AND REASONABLE MEANS OF CONTROLLING AIR POLLUTION, 6.) '1:1 <br /> CB #5058, PIPE II-54" <br /> / L . idif.4e4V'7 ,, `--- / INCLUDING DUST.DUST CAN BE CONTROLLED BY WETTING EXPOSED SOILS, C.) g <br /> // z; WASHING TRUCK WHEELS BEFORE THEY LEAVE THE SITE,AND INSTALLING AND •,-i I:4 <br /> RIM EL=542.29 / <br /> / -.4..,8.........-- ,// <br /> f".-IL.--..1.-8..II--f°,•11-1,-.•-.1).• 4' // ; <br /> ,, ,,,,„ / 1 <br /> 20"CPEP(SW)IE=531.79 / I / ,/./ Pir./f/7 W -744/. <br /> 30"CONC(NE)IE=531.29 / ,4\'"7.-/•,,---friSi -Viii14-Iiir " ' <br /> 30"CW 1 1 84.1-' 2 ° <br /> - ,/- zozsz...04.:04.4*.oz., , ,, TMRAAINCTKA_01NuIrisRA0mCKA JC0ORNsSoTRuURCJE100NF DusTENTRANCES.ANDA (0EvNSIDTRENUcCETI0OFNTRAVEHcICKL.0EuT cA <br /> / // / / ------..,„ i ! <br /> / <br /> ' :/ ' .. . o % ./4/........./. ,4 i ,, / i . TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET SOUND AIR ..., - <br /> ••• '' ''' <br /> '-'' .4-:•':. -----7,- // / <br /> / ./ / <br /> 0 ‘ i 7°- <br /> / AS,94 , , <br /> ,il <br /> I POLLUTION CONTROL AGENCY. <br /> K. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY <br /> .. <br /> 1:1 65 L) <br /> al <br /> PPUt, ,, \ ,. --- . <br /> ID / 16" / <br /> .Q4 AND MATERIAL EXCAVATED DURING UNDERGROUND UTILITY CONSTRUCTION i.••••••-' <br /> -.z --,/,'; ,./C`• / , <br /> ,k_ _„, a <br /> ,n, SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES(WHERE CONSISTENT WITH G.4 <br /> ..S "• ,-, / '•••N. ' - <br /> :, - { < SILT SACK STORM <br /> I 1 ! <br /> / I 1 1 I rg 0 <br /> ..-'',.••''kr VP...,°1CTKED''Llv.S-Y5/,/ <br /> / / gl SAFETY AND SPACE CONSIDERATIONS). <br /> -5-INLET PROTECTION / LOT 3TEMPORARY FILTER FABRIC FENCE ,-, C\IC:1 <br /> 7 ----- -- 's 4,\--",...:', / ••••••,...... / <br /> / .. / 4: 4 <br /> ' / , / PER CITY DETAIL 205A(TYP) <br /> I 0 Cq <br /> I-54" .1. ,. <br /> AND CLEARING LIMIT FENCE 0 <br /> -2- .-- - 1( / / .......„ / / SEE ARCHITECTURAL PLANS FOR <br /> 5.00 '71 „'•3.',/,/ <br /> ..„...-_,..""!..„.,.....N , ___:' / '-i <br /> L >c- // / ..., / <br /> .,, . / <br /> , <br /> // / '"......ZERMANENT SPLIT RAIL FENCE. CONTACT PERSON RESPONSIBLE FOR BMP REPAIR AND <br /> REPLACEMENT En <br /> 4.70 <br /> FLOW DIRECTION rryp) ,4 AREA TO BE INTERPLANTED WITH ,11----,,,,T / / N / <br /> v / / Ce <br /> I NAME: TBD AT BIDDING <br /> -/- ' .. - ' NATIVE CONIFERS N. / C.) <br /> ADDRESS: <br /> g, _„---------' ...---- V SEE LANSCAPING PLANS ......• :..../N NN. / LIMITS OF CATEGORY II <br /> o"--- ...-•'-' / / ...- ,-- ,"••,'i -.,', / / PHONE#: <br /> RIPRAP PROTECTION 8'LENGTH,4' '' \CD\\ \ 4. 7-, / WETLAND(TYP) <br /> I,.,..-, - • --. #." .../ / •."p,698 sv.ft. <br /> WIDTH,12'4THIICONFECSSITyPEERvETRABETTLE L.9.- yitz._ ....›....47_ __4,_ <br /> _ _ _ I <br /> _.--- / \\ / 1 <br /> --..„\f",-- --..,- - _72---,/ - _I ) I <br /> ......., STORM WATER MANAGEMENT\ _,___/ <br /> GA MANUAL t."-' ..„.", '''' <br /> ...a. :•'''`. ..3946" W ._-- _.....--, 1 <br /> .327. - 4 ___.----____ /...„../. - _...... / BMP CODING LEGEND: <br /> 40 lAPT,V•ritlt...0.3.4.40-,,, N 0,.,9'4617.344 97.^-7.- --`s•--..k...7''''''],../..•••mommmEmo...., <br /> •. „,........,„ ...„,. <br /> .....-....mmrim-Eit _...."1 r-:0 <br /> \ ./...-- <br /> '..j.:,` N. ......., ___. -- -- 0 FILTER FABRIC FENCE C <br /> \ <br /> ---- - ----- ....••• --- ---.....s------•--- ,.--'- <br /> , ,. \‘, <br /> • STORM DRAIN INLET PROTECTION E-, <br /> 0 STABILIZED CONSTRUCTION 0 0 <br /> TYPE F STREAM <br /> ENTRANCE 8 TIRE WASH Z L) <br /> WITH 100'BUFFER <br /> 13 RIPRAP PROTECTION <br /> EROSION AND SEDIMENT CONTROL PLAN z z <br /> o w <br /> SCALE:1"=20' o.-4 <br /> Cn 1=4 Z <br /> X PT.1•-4 <br /> W Cf)1:1-1 <br /> Revisions: <br /> , ,CITY COMMENTS <br /> EROSION AND SEDIMENT CONTROL NOTES CONSTRUCTION SEQUENCE: A <br /> 1. SWPPP SHALL BE AVAILABLE ON-SITE AT ALL TIMES. 1. MARK CLEARING LIMITS A <br /> 2. CONTRACTOR SHALL MAINTAIN ALL STRAW WATTLES AND OTHER STORM WATER POLLUTION PREVENTION DEVICES 2. ESTABLISH CONSTRUCTION ACCESS <br /> THROUGHOUT CONSTRUCTION.REMOVE ALL TEMPORARY POLLUTION PREVENTION DEVICES AT THE END OF CONSTRUCTION AS 3. CONTROL FLOW RATES r . ,, <br /> REQUIRED. 4. INSTALL SEDIMENT CONTROLS .------ <br /> - _ ._ <br /> 3. CONTRACTOR SHALL PROVIDE AND MAINTAIN FILTER BAGS AT INLETS LOCATED IN THE ROADWAY. 5. STABILIZE SOILS ..=,........ ..... <br /> 4. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED BEFORE AND AFTER ALL STORMS TO ENSURE MEASURES 6. PROTECT SLOPES Job No.: 28048 <br /> ARE FUNCTIONING PROPERLY. 7. PROTECT DRAIN INLETS ' <br /> 5. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE SWEPT AT THE END OF EACH WORKING DAY OR AS NECESSARY. 8. STABILIZE CHANNELS AND OUTLETS Date: 9/19/08 <br /> 6. DUST CONTROL:APPROPRIATE DUST CONTROL TO BE PROVIDED FOR THE ALLEVIATION OR PREVENTION OF DUST NUISANCE,AT 9. CONTROL POLLUTANTS <br /> THE CONTRACTOR'S EXPENSE. 10. CONTROL DE-WATERING <br /> 11. MAINTAIN BMP'S C5. 1 <br /> 12. MANAGE THE PROJECT(CONSTRUCT STORM <br /> DETENTION VAULT,STORM FILTER MANHOLE,FLOW 14 OF 15 <br /> CONTROL MANHOLE,CDS MANHOLE,CATCH BASINS, <br /> AND STORM DRAIN PIPING FIRST TO BE USED AS A <br /> TEMPORARY SEDIMENT CONTROL) <br />