|
- ---
<br /> POR. NW 1/4, S 14, T 28 N, R 4 E, W.M. 0 10' 20 40' 80' .-...,.
<br /> I- --.- .- •-•-:-_-- _.=,---.•7•- -- ----,.='.
<br /> RIM t,,./ ./.. 7 / ,/ --L-L--
<br /> CR. OF CHANNEL ' "----- / // / /_ / ' •
<br /> 4' .
<br /> 8CONC(N15.)1E=537.53 ------..- -J0,/ / •//2 HOR.SCALE:1"-=20' (1:240)
<br /> / •'.:// . -'-/---.‘'R:17A°E.5L'"74 1 1;1E 1 L 0 T 1 ,•
<br /> ,
<br /> / . /
<br /> ,-,• - / 12"CONC(NE)1.-2=537.08 NORTH Abossein
<br /> 'TLU 1.2"coNc(swg=536.73 .
<br /> CB #5072. TYPE I --------"---";/ 'Ca .z• , !
<br /> RIM EL=.5. 1.28 / / q.'//.--". Engineering,
<br /> 2"CONC(S/E)IE=536.32// 4/ / '...lei/
<br /> /k / / P/// -.111r'v L.L.C.
<br /> / , ,, // ////' / /, '.'s. / / .
<br /> / ESCP STANDARD CITY NOTES
<br /> / „/ , /
<br /> /-,
<br /> , ECHANICAL-MICA
<br /> 9.1DPL,/ 4, • // / 1 A. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THEIR BUFFERS SHALL BE FLAGGED
<br /> I 4 / FOR EASY IDENTIFICATION BEFORE CLEARING TAKES PLACE.AFTER THESE AREAS CIVIL
<br /> - AV
<br /> / i , / t). \i/e 7. / / STOCKPILE AREA
<br /> 7.3s.46,.1:1*6"CY,12,,F. / I I 1 i ARE FLAGGED AND CLEARING LIMITS ARE APPROVED,AN AREA WIDE ENOUGH TO FIRE PROTECTION
<br /> / I / / / / y/M FOR BMP'S
<br /> / / o INSTALL A SILT FENCE AT THE CLEARING LIMITS,BY HAND OR BY MECHANICAL
<br /> 2100 112TH AVE.NE
<br /> iNT 0 • ' 0 0 /.//4, ,7,,,? EMERGENCY REPAIR v- I
<br /> u-, 1 11 METHODS,MAY BE CLEARED.THE TOP OF THE SILT FENCE SHALL BE REFLAGGED
<br /> r L
<br /> pC,6 0.2
<br /> , ,,,
<br /> 4. 1
<br /> CB #5071, TYPE I / 1 ,
<br /> // , c•
<br /> SILT SACK STORM
<br /> ////..., 04 pv ^ __ 739.36'
<br /> / . ' ,1::... ., INLET PROTECTION // 1 1 i AFTER INSTALLATION.IF A SILT FENCE IS NOT REQUIRED,THE AREA SHALL BE
<br /> DELINEATED USING AN ORANGE BARRIER. BUM, IA 98004
<br /> PH:(425)462-9441
<br /> BIM EL=541.03
<br /> 12"CONC(VS)IE=535.97/ // A. / •
<br /> ti 8
<br /> ll i B. ALL PERIMETER EROSION AND SEDIMENT CONTROL SHALL BE CONSTRUCTED,
<br /> OPERATIONAL,AND INSPECTED BY THE PUBLIC WORKS INSPECTOR PRIOR TO FAX: (425)462-9451
<br /> 8 0 4" / /,r.,4T /1 ,
<br /> " -." IP
<br /> * --,-
<br /> _- -_ I, INITIATION OF CLEARING AND GRUBBING OPERATIONS.
<br /> C. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING B-14:cservitelimmin.com
<br /> Inmabossein.com
<br /> / / 0 , / BOTH THE DEVELOPER AND PUBLIC WORKS INSPECTOR.NO TREES SHALL BE
<br /> y 1.1 / / / _ NAARTEAIVETOCOBNEIFE
<br /> / INTERPLANTEDRS WITR-I /";):// / REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES.
<br /> D. WHERE POSSIBLE,NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION -- --- ---
<br /> CD /I
<br /> 1 2/.;/./ .
<br /> .. / / • •
<br /> ''' 1/4./ - I 6-/C• . •//j
<br /> 4 /
<br /> ,,,,..//1 /
<br /> . /,->"/ // z/ //
<br /> /,/z / .40-...‘%...Z SEE LANSCAPING PLANS
<br /> I // /i 1
<br /> ----, I // / 11 AND SEDIMENT CONTROL.
<br /> E. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE,THE
<br /> EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED AS
<br /> '4'''',4 / REQUIRED TO ENSURE CONTINUING EROSION/SEDIMENT CONTROL.
<br /> CB #5070, TYPE I /1 , / 0.
<br /> RIM EL=541.19 / / / 1 7'7 7,.,‘ / 7/ I il '21 / F. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED
<br /> 12"CONC(N/B)1E=535.2e / /
<br /> w / N.... 4. IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR
<br /> ,// I////,. •/ / \ 14..... / 105'WETLAND___L.__ /' , /
<br /> / / 1/// 34i
<br /> / / / ,. BUFFER(TYP) 'N' / r 1/2',,j/ 1 "F...... CONSTRUCTION IS COMPLETED,PERMANENT DRAINAGE FACILITIES ARE
<br /> -40. 4*.- 1.11 fl OPERATIONAL,AND THE POTENTIAL FOR EROSION HAS PASSED.
<br /> ' / // G. AT A MINIMUM,EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE
<br /> CB #5069, TYPE I // --..>
<br /> , /,.// / N /19.140111? L
<br /> -..
<br /> RIM EL=541.21 4,', /'. . / ,..".....0..' SILT SACK STORM // OT 2 -,..., 4"CANN.,,si /I/ MAINTAINED MONTHLY,OR FOLLOWING EACH RUNOFF-PRODUCING STORM,TO
<br /> , ,,0
<br /> 12"CONC(N)IF.=534.21 /f .. 1 ///. 4.4citei/ INLET PROTECTION / I
<br /> I ENSURE PROPER OPERATION OF ALL EROSION AND SEDIMENT CONTROL
<br /> ...9r-4...-.Pr- 1lb. / FACILITIES.SSMH #2 / 0,,./..'/ / , - L,'. 11,44%14,41W,(0 .,,
<br /> 'I
<br /> H.' (
<br /> RIM EL=543.23 I .gir..tex...or-..t.7,..
<br /> 4 Oa;WV: -, / H. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN,SIZE,
<br /> i'N / 1 "S I
<br /> CTR. OE CHANNEL / / / Ct " 4' ';.- 71r-1---1.' /.-*" 105'WETLAND BUFFER ) NOR LOCATION OF PERMANENT PIPES,RESTRICTORS,OR DETENTION FACILITIES;
<br /> 8"CONC(NE/SW)IE=535.01 I / , . G• ' :''''.11.411f N : // 's\ I I BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMPS ONLY. b.!)
<br /> 8"CONC(NW)IE=535.01
<br /> I TEMPORARY CONSTRUCTION
<br /> ENTRANCE AND TIRE WASH . - If
<br /> °- -'''',..111-•••'04-' ' / ---- ---,/ I
<br /> / . I I. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN.TRACKING OF MUD AND DEBRIS '0
<br /> 1,01'AV:46,Z.' 4 J.
<br /> . TFRHOEMwTAsHEHISNIGTTE0WNILSLTNAOTETCBLEEAALNLOAIWREADC.TFARIELQUURIERTEOS TCHOEMLIPSLYEWOFITHALTLHKISNOCOWNND,CONDITION r-I
<br /> 1 '''-'; PER CITY DETAIL 208 \ , , , ---/ .,,,. ,-,
<br /> 14 N.41161' ---1- N 57'39'46" W / / _____I/ WILL RESULT IN ALL WORK ON THE SITE BEING STOPPED.
<br /> PUMP
<br /> ilk. I./ / i'" .' Y
<br /> /..,1•41;411, /NAM,' // ,
<br /> ' 4 191.61' -7- -..
<br /> HOUSE /' ® ', k I / AVAILABLE,AND REASONABLE MEANS OF CONTROLLING AIR POLLUTION, 6.) '1:1
<br /> CB #5058, PIPE II-54"
<br /> / L . idif.4e4V'7 ,, `--- / INCLUDING DUST.DUST CAN BE CONTROLLED BY WETTING EXPOSED SOILS, C.) g
<br /> // z; WASHING TRUCK WHEELS BEFORE THEY LEAVE THE SITE,AND INSTALLING AND •,-i I:4
<br /> RIM EL=542.29 /
<br /> / -.4..,8.........-- ,//
<br /> f".-IL.--..1.-8..II--f°,•11-1,-.•-.1).• 4' // ;
<br /> ,, ,,,,„ / 1
<br /> 20"CPEP(SW)IE=531.79 / I / ,/./ Pir./f/7 W -744/.
<br /> 30"CONC(NE)IE=531.29 / ,4\'"7.-/•,,---friSi -Viii14-Iiir " '
<br /> 30"CW 1 1 84.1-' 2 °
<br /> - ,/- zozsz...04.:04.4*.oz., , ,, TMRAAINCTKA_01NuIrisRA0mCKA JC0ORNsSoTRuURCJE100NF DusTENTRANCES.ANDA (0EvNSIDTRENUcCETI0OFNTRAVEHcICKL.0EuT cA
<br /> / // / / ------..,„ i !
<br /> /
<br /> ' :/ ' .. . o % ./4/........./. ,4 i ,, / i . TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET SOUND AIR ..., -
<br /> ••• '' '''
<br /> '-'' .4-:•':. -----7,- // /
<br /> / ./ /
<br /> 0 ‘ i 7°-
<br /> / AS,94 , ,
<br /> ,il
<br /> I POLLUTION CONTROL AGENCY.
<br /> K. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY
<br /> ..
<br /> 1:1 65 L)
<br /> al
<br /> PPUt, ,, \ ,. --- .
<br /> ID / 16" /
<br /> .Q4 AND MATERIAL EXCAVATED DURING UNDERGROUND UTILITY CONSTRUCTION i.••••••-'
<br /> -.z --,/,'; ,./C`• / ,
<br /> ,k_ _„, a
<br /> ,n, SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES(WHERE CONSISTENT WITH G.4
<br /> ..S "• ,-, / '•••N. ' -
<br /> :, - { < SILT SACK STORM
<br /> I 1 !
<br /> / I 1 1 I rg 0
<br /> ..-'',.••''kr VP...,°1CTKED''Llv.S-Y5/,/
<br /> / / gl SAFETY AND SPACE CONSIDERATIONS).
<br /> -5-INLET PROTECTION / LOT 3TEMPORARY FILTER FABRIC FENCE ,-, C\IC:1
<br /> 7 ----- -- 's 4,\--",...:', / ••••••,...... /
<br /> / .. / 4: 4
<br /> ' / , / PER CITY DETAIL 205A(TYP)
<br /> I 0 Cq
<br /> I-54" .1. ,.
<br /> AND CLEARING LIMIT FENCE 0
<br /> -2- .-- - 1( / / .......„ / / SEE ARCHITECTURAL PLANS FOR
<br /> 5.00 '71 „'•3.',/,/
<br /> ..„...-_,..""!..„.,.....N , ___:' / '-i
<br /> L >c- // / ..., /
<br /> .,, . /
<br /> ,
<br /> // / '"......ZERMANENT SPLIT RAIL FENCE. CONTACT PERSON RESPONSIBLE FOR BMP REPAIR AND
<br /> REPLACEMENT En
<br /> 4.70
<br /> FLOW DIRECTION rryp) ,4 AREA TO BE INTERPLANTED WITH ,11----,,,,T / / N /
<br /> v / / Ce
<br /> I NAME: TBD AT BIDDING
<br /> -/- ' .. - ' NATIVE CONIFERS N. / C.)
<br /> ADDRESS:
<br /> g, _„---------' ...---- V SEE LANSCAPING PLANS ......• :..../N NN. / LIMITS OF CATEGORY II
<br /> o"--- ...-•'-' / / ...- ,-- ,"••,'i -.,', / / PHONE#:
<br /> RIPRAP PROTECTION 8'LENGTH,4' '' \CD\\ \ 4. 7-, / WETLAND(TYP)
<br /> I,.,..-, - • --. #." .../ / •."p,698 sv.ft.
<br /> WIDTH,12'4THIICONFECSSITyPEERvETRABETTLE L.9.- yitz._ ....›....47_ __4,_
<br /> _ _ _ I
<br /> _.--- / \\ / 1
<br /> --..„\f",-- --..,- - _72---,/ - _I ) I
<br /> ......., STORM WATER MANAGEMENT\ _,___/
<br /> GA MANUAL t."-' ..„.", ''''
<br /> ...a. :•'''`. ..3946" W ._-- _.....--, 1
<br /> .327. - 4 ___.----____ /...„../. - _...... / BMP CODING LEGEND:
<br /> 40 lAPT,V•ritlt...0.3.4.40-,,, N 0,.,9'4617.344 97.^-7.- --`s•--..k...7''''''],../..•••mommmEmo....,
<br /> •. „,........,„ ...„,.
<br /> .....-....mmrim-Eit _...."1 r-:0
<br /> \ ./...--
<br /> '..j.:,` N. ......., ___. -- -- 0 FILTER FABRIC FENCE C
<br /> \
<br /> ---- - ----- ....••• --- ---.....s------•--- ,.--'-
<br /> , ,. \‘,
<br /> • STORM DRAIN INLET PROTECTION E-,
<br /> 0 STABILIZED CONSTRUCTION 0 0
<br /> TYPE F STREAM
<br /> ENTRANCE 8 TIRE WASH Z L)
<br /> WITH 100'BUFFER
<br /> 13 RIPRAP PROTECTION
<br /> EROSION AND SEDIMENT CONTROL PLAN z z
<br /> o w
<br /> SCALE:1"=20' o.-4
<br /> Cn 1=4 Z
<br /> X PT.1•-4
<br /> W Cf)1:1-1
<br /> Revisions:
<br /> , ,CITY COMMENTS
<br /> EROSION AND SEDIMENT CONTROL NOTES CONSTRUCTION SEQUENCE: A
<br /> 1. SWPPP SHALL BE AVAILABLE ON-SITE AT ALL TIMES. 1. MARK CLEARING LIMITS A
<br /> 2. CONTRACTOR SHALL MAINTAIN ALL STRAW WATTLES AND OTHER STORM WATER POLLUTION PREVENTION DEVICES 2. ESTABLISH CONSTRUCTION ACCESS
<br /> THROUGHOUT CONSTRUCTION.REMOVE ALL TEMPORARY POLLUTION PREVENTION DEVICES AT THE END OF CONSTRUCTION AS 3. CONTROL FLOW RATES r . ,,
<br /> REQUIRED. 4. INSTALL SEDIMENT CONTROLS .------
<br /> - _ ._
<br /> 3. CONTRACTOR SHALL PROVIDE AND MAINTAIN FILTER BAGS AT INLETS LOCATED IN THE ROADWAY. 5. STABILIZE SOILS ..=,........ .....
<br /> 4. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED BEFORE AND AFTER ALL STORMS TO ENSURE MEASURES 6. PROTECT SLOPES Job No.: 28048
<br /> ARE FUNCTIONING PROPERLY. 7. PROTECT DRAIN INLETS '
<br /> 5. ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE SWEPT AT THE END OF EACH WORKING DAY OR AS NECESSARY. 8. STABILIZE CHANNELS AND OUTLETS Date: 9/19/08
<br /> 6. DUST CONTROL:APPROPRIATE DUST CONTROL TO BE PROVIDED FOR THE ALLEVIATION OR PREVENTION OF DUST NUISANCE,AT 9. CONTROL POLLUTANTS
<br /> THE CONTRACTOR'S EXPENSE. 10. CONTROL DE-WATERING
<br /> 11. MAINTAIN BMP'S C5. 1
<br /> 12. MANAGE THE PROJECT(CONSTRUCT STORM
<br /> DETENTION VAULT,STORM FILTER MANHOLE,FLOW 14 OF 15
<br /> CONTROL MANHOLE,CDS MANHOLE,CATCH BASINS,
<br /> AND STORM DRAIN PIPING FIRST TO BE USED AS A
<br /> TEMPORARY SEDIMENT CONTROL)
<br />
|