Laserfiche WebLink
1 <br /> Stormwater Management Report Everett, WA <br /> Oil Sheen on Water Prevalent and visible oil sheen. Oil removed from water using oil <br /> absorbent pads or vactor truck. <br /> Source of oil located and corrected.If <br /> chronic low levels of oil persist,plant <br /> wetland plants such as Juncus Uffuses <br /> (soft rush)which can uptake small <br /> concentrations of oil. <br /> Erosion Erosion of the pond's side slopes and/or scouring Slopes stabilized using proper erosion <br /> of the pond bottom,that exceeds 6-inches,or control measures and repair methods. <br /> where continued erosion is prevalent. <br /> Settlement of Pond Any part of these components that has settled 4- Dike/berm is repaired to pecifications. <br /> Dike/Berm inches or lower than the design elevation,or <br /> inspector determines dike/berm is unsound. <br /> Internal Berm Berm dividing cells should be level. Berm surface is leveled so that water <br /> flows evenly over entire length of <br /> berm. <br /> Overflow Spillway Rock is missing and soil is exposed at top of Rocks replaced to specifications. <br /> spillway or outside slope. <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> 1 PACLAND Job# 50183001 Page 8 <br />