Laserfiche WebLink
I <br /> Stormwater Management Report Everett, WA <br /> I <br /> Table of Contents <br /> Section Page <br /> Stormwater Drainage Report 2 <br /> I. Project Overview 2-3 <br /> a. Project Location <br /> b. Design Criteria <br /> c. Nature and Goals of Project <br /> II. Preliminary Conditions Summary 3 <br /> a. Existing Conditions <br /> b. Proposed Conditions <br /> III. Off-Site Analysis 3 <br /> 1 IV. Analysis and Design of Required Erosion and Sediment Control BMPs 3 <br /> V. Analysis and Design of Required Runoff Control (Treatment and Stream Bank Erosion <br /> Control) BMPs 3-4 <br /> VI. Analysis and Design of Required Source Control BMPs 4 <br /> VII. Special Reports and Studies 4 <br /> VIII. Other Permits 4 <br /> IX. Miscellaneous Forms and Worksheets 4 <br /> X. Maintenance and Operation Requirements 4-7 <br /> a. Number 1 — Catch Basins <br /> r b. Number 2 — Fencing <br /> c. Number 3 — Conveyance Pipes and Ditches <br /> d. Number 4 — Grounds (Landscaping) <br /> e. Number 5 — Wetponds <br /> Appendices: <br /> Exhibit A — Pre-Developed Conditions Map <br /> Exhibit B — Post-Developed Conditions Map <br /> Exhibit C — Pond Volume Calculations <br /> Exhibit D — Area Calculations <br /> Exhibit E — StormShed Calculations <br /> Exhibit F — Permit Plans <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> PACLAND Job# 50183001 Page 1 <br />