Laserfiche WebLink
• <br /> Verizon Communications-Stormwater Site Plan Everett,WA <br /> Table of Contents <br /> Section Page <br /> Stormwater Site Plan 2 <br /> I. Project Overview 2 <br /> a. Project Location <br /> b. Design Criteria <br /> II. Preliminary Conditions Summary. 3 <br /> a. Existing Conditions <br /> b. Discharge at Natural Location <br /> c. Wells, Septic Tanks and Fuel Tanks <br /> d. Pre-Developed Conditions Map <br /> III. Off-Site Analysis 4 <br /> a. Upstream Analysis <br /> b. Downstream Analysis <br /> IV. Analysis and Design of Required Erosion and Sediment Control BMPs 10 <br /> a. Construction Sequence and Procedure <br /> b. Soil Stabilization and Sediment Trapping <br /> c. Permanent Erosion Control and Site Restoration <br /> d. Inspection Sequence <br /> e. Control of Pollutants Other Than Sediments <br /> f. Utilities <br /> V. Analysis and Design of Required Runoff Control BMPs 12 <br /> a. Flow Control <br /> b. Water Quality <br /> c. Conveyence <br /> d. 100-Year Flood/Overflow Condition <br /> VI. . Analysis and Design of Required Source Control BMPs 25 <br /> VII. Special Reports and Studies 25 <br /> VIII. Other Permits.... ............. 25 <br /> IX. Miscellaneous Forms and Worksheets 25 <br /> X. Maintenance and Operation Requirements 26 <br /> a. Number 1 — Catch Basins <br /> b. Number 2 — Fencing <br /> c. Number 3 —Conveyance Pipes and Ditches <br /> d. Number 4 — Grounds (Landscaping) <br /> e. Number 5 — StormFilter <br /> f. Number 6 — Bioretention Areas <br /> PACLAND Job#50183001 Page 1 <br />