Laserfiche WebLink
Verizon Communications-Stormwater Site Plan Everett, WA <br /> Off-Site Analysis <br /> An upstream and downstream analysis was conducted on October 15, 2009. <br /> Upstream Analysis <br /> # Photo Description <br /> The upstream (south) <br /> side of the site is <br /> bordered by the Kasch <br /> Park Road. Since Kasch <br /> Park Road has curb and <br /> 41. gutter, no upstream run- <br /> • on enters the site. <br /> No upstream was <br /> observed during the site <br /> visit. <br /> Photo: Kasch Park Road <br /> .. ., ��. looking east. <br /> PACLAND Job#50183001 Page 4 <br />