Laserfiche WebLink
Verizon Communications-Stormwater Site Plan Everett, WA <br /> C. Permanent Erosion Control and Site Restoration <br /> For the portions of the developed site that aren't covered by buildings, pavement, <br /> sidewalks, and other hard surfacing; grass, ground cover, or mulch will cover all exposed <br /> areas. <br /> D. Inspection Sequence (weekly and after major rainfalls) <br /> E. Control of Pollutants Other Than Sediments <br /> Pollutants shall be controlled on the work site with a Fuel Management Area per the <br /> Department of Ecology's requirements. This shall include a centralized area for <br /> equipment, concrete truck washing and temporary storage of debris and stockpiled <br /> materials. <br /> F. Utilities <br /> New utilities will be coordinated with the individual utility contacts. Erosion and sediment <br /> controls will be sequenced for construction activities to ensure erosion and sediment <br /> transport does not occur during utility installation. Temporary systems are not to be <br /> removed until permanent systems are "on-line" and approved by inspector. <br /> PACLAND Job#50183001 Page 11 <br />