My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2610 W CASINO RD VERIZON 2025-07-25
>
Address Records
>
W CASINO RD
>
2610
>
VERIZON
>
2610 W CASINO RD VERIZON 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 10:26:46 AM
Creation date
7/25/2025 9:30:34 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
2610
Tenant Name
VERIZON
Notes
STORM DRAINAGE ANALYSIS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Verizon Communications-Stormwater Site Plan Everett, WA <br /> Water Quality <br /> Despite the fact the site is currently developed, water quality is required to be provided for <br /> the new or replaced pollution generating surfaces. However, the proposed water quality <br /> facility has been sized to accommodate all the pollution generating and non-pollution <br /> generating surfaces. The areas used to calculate the size of the water quality facility are as <br /> shown in Table 5 below: <br /> Table 5 <br /> Water Quality <br /> Only areas affected by development included in calculations. <br /> Proposed <br /> SF AC <br /> Pervious 78,745 1.80 <br /> Impervious(PGIS& NPGIS) 318,504 7.32 <br /> TOTAL 397,249 9.12 <br /> To satisfy the project's water quality requirements, a pre-settling chamber and a Contech <br /> StormFilter Vault will be installed. A flow splitter will also be installed to allow higher <br /> flow events to bypass these structures. <br /> Basin Data j PCN Calc PTC Calc DCI-CN Calc DCI-TC Cale Compute Runoff for Design Event I <br /> Select Design Event: WQ •j Compute <br /> AMC for this Computation: <br /> Project AMC.2 <br /> AMC G AMC2 AMC3 <br /> Static <br /> Peak Rate: 1.8132 cfs <br /> Time to Peak: 480.00 min.(8.00 hrs) <br /> Hydrograph Vol: 28629.25 cf(0.6572 acft) <br /> ===>Computation is+1-99.9967%of theoretical for time step of 10.00 min <br /> Close I Apply <br /> SBUH methodology and StormShed software were used to calculate the site discharge and <br /> to size the proposed water quality facilities. Per the DOE Manual, the water quality flow <br /> rate is calculated from a rainfall that is 72% of the 2-year, 24-hour event. The rainfall for <br /> the 2-year, 24-hour event, per the City of Everett Stormwater Manual, is 1.55 inches. <br /> Therefore, the 6-month, 24-hour (water quality) event rainfall is 1.12 inches. The peak <br /> flow for the water quality event for the fully developed, 9.12 acre site is approximately <br /> 1.81 CFS and 28,629 CF of storage volume. <br /> PACLAND Job# 50183001 Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.