Laserfiche WebLink
Verizon Communications-Stormwater Site Plan Everett,WA <br /> VI. Analysis and Design of Required Source Control BMPs <br /> The proposed development does not fit into any categories list in Table 1-4.1 and 1-4.2 of <br /> the City of Everett Stormwater Management Manual, dated January 1997. Based on these <br /> requirements, no source control should be required and therefore is not proposed. <br /> VII. Special Reports and Studies <br /> The project site does not include any environmentally sensitive areas, therefore no special <br /> reports or studies are required. <br /> VIII. Other Permits <br /> An NPDES permit will be obtained before construction begins. <br /> IX. Miscellaneous Forms and Worksheets <br /> Any covenants, dedications, or easements will be addressed at a later submittal. <br /> PACLAND job#50183001 Page 25 <br />