Laserfiche WebLink
I <br /> Stormwater Management Report Everett,WA <br /> I <br /> Proper maintenance is important for adequate functioning of the stormwater facilities. The <br /> Ifollowing maintenance program is recommended for this project: <br /> INO. 1 — CATCH BASINS <br /> Maintenance Defect or Problem Conditions When Maintenance is Needed Results Expected When <br /> Component Maintenance is performed <br /> General Trash &Debris Trash or debris of more than'/z cubic foot which No Trash or debris located <br /> (Includes Sediment) is located immediately in front of the catch basin immediately in front of catch basin <br /> opening or is blocking capacity of the basin by opening. <br /> I more than 10%. <br /> Trash or debris(in the basin)that exceeds 1/3 the No trash or debris in the catch basin. <br /> depth from the bottom of basin to invert the <br /> lowest pipe into or out of the basin. <br /> I Trash or debris in any inlet or outlet pipe blocking Inlet and outlet pipes free of trash or <br /> more than 1/3 of its height. debris. <br /> Dead animals or vegetation that could generate No dead animals or vegetation <br /> odors that could cause complaints or dangerous present within the catch basin. <br /> gases(e.g.,methane). <br /> I <br /> Deposits of garbage exceeding 1 cubic foot in No condition present which would <br /> I volume. attract or support the breeding of <br /> insects or rodents. <br /> Structure Damage to Corner of frame extends more than 3/inch past Frame is even with curb. <br /> Frame and/or Top curb face into the street(If applicable). <br /> I Slab <br /> • Top slab has holes larger than 2 square inches Top slab is free of holes and cracks. <br /> or cracks wider than 1/4 inch(intent is to make <br /> Isure all material is running into basin). <br /> Frame not sitting flush on top slab,i.e.,separation Frame is sitting flush on top slab. <br /> of more than 3/4 inch of the frame from the top <br /> I <br /> slab. <br /> Cracks in Basin Cracks wider than '/z inch and longer than 3 feet, Basin replaced or repaired to design <br /> Walls/Bottom any evidence of soil particles entering catch basin standards. <br /> through cracks,or maintenance person judges that <br /> Istructure is unsound. <br /> Cracks wider than'/z inch and longer than 1 foot at No cracks more than'A inch wide at <br /> the joint of any inlet/outlet pipe or any evidence of the joint of inlet/outlet pipe. <br /> Isoil particles entering catch basin through cracks. <br /> Settlement/ Basin has settled more than 1 inch or has rotated Basin replaced or repaired to design <br /> Misalignment more than 2 inches out of alignment. standards. <br /> IFire Hazard Presence of chemicals such as natural gas,oil and No flammable chemicals present. <br /> gasoline. <br /> I Vegetation Vegetation growing across and blocking more than No vegetation blocking opening to <br /> 10%of the basin opening. basin. <br /> Vegetation growing in inlet/outlet pipe joints that is No vegetation or root growth present. <br /> more than 6 inches tall and less than 6 inches <br /> I apart. <br /> Pollution Nonflammable chemicals of more than '/ cubic No pollution present other than <br /> foot per three feet of basin length. surface film. <br /> I <br /> IPACLAND Job# 50183001 Page 5 <br />