Laserfiche WebLink
Verizon Communications- Stormwater Site Plan Everett, WA <br /> lll. Off-Site Analysis <br /> An upstream and downstream analysis was conducted on October 15, 2009. <br /> Upstream Analysis <br /> # Photo Description <br /> ' The upstream (south) <br /> side of the site is <br /> bordered by the Kasch <br /> I - Park Road. Since Kasch <br /> '•` #�` Park Road has curb and <br /> gutter, no upstream run- <br /> on+ , enters the site. <br /> k �•,tiy No upstream was <br /> Nw observed during the site <br /> visit. <br /> ' Photo: Kasch Park Road <br /> looking east. <br /> 1 <br /> PACLAND Job# 50183001 Page 4 <br />