Laserfiche WebLink
I <br /> Verizon Communications-Stormwater Site Plan Everett, WA <br /> I <br /> I — " <br /> t t <br /> I <br /> Runoff is conveyed <br /> in an easterly <br /> direction within W <br /> ,- `" Casino Road. <br /> 5 <br /> oto: Northeast <br /> corner of site, <br /> I <br /> lookingPh east along <br /> W Casino Road. <br /> W Casino Road ~'±'t <br /> I <br /> I <br /> P <br /> r fat ' <br /> g� � <br /> �l <br /> w y. Runoff is conveyed <br /> , . <br /> tiv to the north in a 48- <br /> 1 inch pipe. <br /> f, <br /> 6 11 ` `I Photo: (Looking <br /> • ._ north) 48 inch pipe <br /> �, is located at the toe <br /> �; of the landscaped <br /> I <br /> r" ���` slope, outside of the <br /> Drainage pictured fence. <br /> system <br /> � I <br /> PACLAND Job# 50183001 Page 8 <br />