Laserfiche WebLink
r <br /> Verizon Communications-Stormwater Site Plan Everett, WA <br /> 1 <br /> ' VI. Analysis and Design of Required Source Control BMPs <br /> The proposed development does not fit into any categories list in Table 1-4.1 and 1-4.2 of <br /> the City of Everett Stormwater Management Manual, dated January 1997. Based on these <br /> requirements, no source control should be required and therefore is not proposed. <br /> ' VII. Special Reports and Studies <br /> The project site does not include any environmentally sensitive areas, therefore no special <br /> reports or studies are required. <br /> ' VIII. Other Permits <br /> An NPDES permit will be obtained before construction begins. <br /> IX. Miscellaneous Forms and Worksheets <br /> Any covenants, dedications, or easements will be addressed at a later submittal. <br /> I <br /> 1 <br /> 1 <br /> I <br /> PACLAND Job# 50183001 Page 25 <br />