My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BOEING PARKING LOTS - E 6 2025-07-25
>
Address Records
>
W CASINO RD
>
3003
>
BOEING PARKING LOTS - E 6
>
3003 W CASINO RD BOEING PARKING LOTS - E 6 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 10:36:49 AM
Creation date
7/25/2025 10:35:48 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BOEING PARKING LOTS - E 6
Notes
DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Report <br /> Boeing Everett-E-6 Parking Lot Expansion July 16,2013 <br /> to prevent surface flows to and from the existing parking lot. TABLE 1 summarizes the <br /> developed site conditions and land cover. <br /> 8.4 Stormwater Flow Control Plan <br /> Not applicable. The project site is exempt from flow control requirements as it is vested under <br /> the previously accepted 1991 Boeing Master Plan. See APPENDIX F for correspondence with <br /> the City of Everett approving the exemption. <br /> 8.5 Stormwater Treatment Plan <br /> Not applicable. The project site is exempt from water quality requirements as it is vested under <br /> the previously accepted 1991 Boeing Master Plan. See APPENDIX F for correspondence with <br /> the City of Everett approving the exemption. <br /> 8.6 Conveyance Analysis <br /> Conveyance calculations were completed for the new asphalt parking lot. Results showed that an <br /> 8" pipe would provide adequate capacity for the 100-year storm event. However, 12" diameter <br /> storm pipe will be used to match the majority of the Boeing conveyance system and provide a <br /> factor of safety during high flows. See conveyance calculations in APPENDIX E for the design <br /> ' of the onsite conveyance system. <br /> 8.7 Operation and Maintenance Plan <br /> An Operation and Maintenance Manual was prepared for the proposed catch basins. It is attached <br /> in APPENDIX B. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 20130715_Drainage Report_Boeing Everett_Gate E-6 Parking Lot.doc Page 16 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.