Laserfiche WebLink
I <br /> O&M Manual July 12, 2013 <br /> Boeing Everett — E-6 Parking Lot Expansion <br /> Operation and Maintenance Manual <br /> Person or Organization Responsible for Maintenance of the On-Site Storm System: <br /> The Boeing Company <br /> ' Maintenance Division <br /> 3003 West Casino Road <br /> Everett,WA 98203 <br /> The Location Where the Operation and Maintenance Manual is to be Kept: <br /> 140-11 Building—Shared Services Group <br /> Boeing Everett Plant <br /> 3003 West Casino Road <br /> IEverett, WA 89203 <br /> *Note: The manual and maintenance activity log must be made available to the City of <br /> Everett for inspection purposes. <br /> Description of On-Site Storm System <br /> P y <br /> The on-site storm system for the E-6 Parking Lot Expansion project consists of Type 1 <br /> and Type 2 catch basins with spill control elbows, along with 12" SDR35 storm pipe <br /> connecting the proposed catch basins to the existing Boeing stormwater conveyance <br /> system. <br /> Stormwater runoff from the site will be captured in new catch basins situated in the flow <br /> lines of the new parking lot. Stormwater will be conveyed through the proposed system <br /> and into the existing Boeing stormwater conveyance system along the west side,of the <br /> new asphalt parking lot via 8" SDR35 storm pipe. Once the stormwater enters the <br /> existing system, it is routed east and north to the existing Powder Mill Gulch <br /> detention/water quality pond. All four onsite catch basins will have a downturned 90 <br /> degree elbow for oil/water separation/spill control. <br /> The spill control elbows serve as source control of pollution on the project site. In order <br /> to control pollutants,proper maintenance and cleaning of debris, sediments, and oil from <br /> stormwater collection and conveyance systems is required per the operation and <br /> maintenance recommendations found in the City of Everett Stormwater Manual and also <br /> applicable 2012 Department of Ecology Stormwater Manual maintenance <br /> recommendations. See the attached sheets for operation and maintenance requirements <br /> pertaining to the project. <br /> 1 <br /> rE-6 Parking Lot Expansion DCG, Inc. <br /> I <br />