Laserfiche WebLink
I <br /> I Table 3.2.5 <br /> Maintenance of Control Structures and Catchbasins <br /> Maintenance Results Expected When <br /> Component Defect Condition When Maintenance is Needed Maintenance is Performed <br /> General Trash& Trash or debris which is located immediately in No Trash or debris located <br /> Debris front of the catch basin opening or is blocking immediately in front of catch basin or <br /> inletting capacity of the basin by more than 10%. on grate opening. <br /> Trash or debris(in the basin)that exceeds 60 No trash or debris in the catch basin. <br /> percent of the sump depth as measured from the <br /> I bottom of basin to invert of the lowest pipe into or <br /> out of the basin,but in no case less than a <br /> minimum of six inches clearance from the debris <br /> surface to the invert of the lowest pipe. <br /> Trash or debris in any inlet or outlet pipe blocking Inlet and outlet pipes free of trash or <br /> more than 1/3 of its height. debris. <br /> Dead animals or vegetation that could generate No dead animals or vegetation <br /> odors that could cause complaints or dangerous present within the catch basin. <br /> gases(e.g.,methane). <br /> Sediment Sediment(in the basin)that exceeds 60 percent of No sediment in the catch basin. <br /> the sump depth as measured from the bottom of <br /> I basin to invert of the lowest pipe into or out of the <br /> basin,but in no case less than a minimum of 6 <br /> inches clearance from the sediment surface to the <br /> invert of the lowest pipe. <br /> Measured from the bottom of basin to invert of the <br /> lowest pipe into or out of the basin. <br /> Structure Top slab has holes larger than 2 square inches or Top slab is free of holes and cracks. <br /> Damage to cracks wider than 1/4 inch. <br /> Frame <br /> and/or Top (Intent is to make sure no material is running into <br /> Slab basin). <br /> Frame not sitting flush on top slab,i.e., Frame is sitting flush on the riser <br /> separation of more than 3/4 inch of the frame from rings or top slab and firmly attached. <br /> the top slab.Frame not securely attached <br /> Fractures or Maintenance person judges that structure is Basin replaced or repaired to design <br /> Cracks in unsound. standards. <br /> Basin Walls/ <br /> Bottom Grout fillet has separated or cracked wider than Pipe is regrouted and secure at basin <br /> 1/2 inch and longer than 1 foot at the joint of any wall. <br /> inlet/outlet pipe or any evidence of soil particles <br /> entering catch basin through cracks. <br /> Settlement/ If failure of basin has created a safety,function,or Basin replaced or repaired to design <br /> Misalignme design problem. standards. <br /> nt <br /> I Vegetation Vegetation growing across and blocking more than No vegetation blocking opening to <br /> 10%of the basin opening. basin. <br /> Vegetation growing in inlet/outlet pipe joints that No vegetation or root growth present. <br /> is more than six inches tall and less than six <br /> inches apart. <br /> Contaminati See"Detention Ponds". No pollution present. <br /> on and <br /> Pollution <br /> Volume III—Hydrologic Analysis and Flow Control BMPs—August 2012 <br /> 3-56 <br /> I <br />