Laserfiche WebLink
MAGNUSSON I <br /> KLEMENCIC <br /> ASSOCIATES ■ <br /> The table below summarizes the results of the calculations: <br /> Table 2. <br /> Condition 2-Year Storm Event Discharge(cfs) 50-Year Storm Event Discharge(cfs) <br /> Pre-Developed 0.9 2.1 <br /> Developed 3.9 (0.9 al I oveabl e) 9.2 (2.1 al I ovabl e) <br /> It is critical to note that the pre-developed condition does not actually discharge flow into a conventional <br /> drainage system. Therefore,the proposed condition is designed to match the existing condition to the <br /> greatest extent feasible,which is to detain the runoff in the detention ponds and slowly release it back <br /> into the combined system. <br /> The detention pond design has been performed in accordance with Volume 4, Chapter 3 of the <br /> Stormwater Management Manual. <br /> C O N VFYA_N CF ANLAJ YSI S <br /> The drainage system's conveyance systems have been analyzed and included as Figures 6 and 7 of this <br /> Plan. Pipes are designed to be under pressure during large storm events to provide additional storage. <br /> A minimum time of concentration of 5 minutes is assumed. <br /> Riprap is utilized at the pipe outlets and inlets at the detention ponds, and also as the slope protection <br /> for the rain garden and swale leading down into the ponds. Riprap sizing is in accordance with the <br /> Open Conveyance Protection Table 6.3 of Volume 1, Chapter 6 of the Stormwater Management <br /> Manual. The highest concentrated flow velocity anticipated is 3.3 ft/s,which occurs on the 3:1 pond <br /> slope during the 100-year storm event. It is anticipated that rock cobble will be readily available in <br /> various sizes during the excavation of the pond. For uniformity and in order to re-use and avoid export <br /> of those available materials,the riprap for all locations will be designed to be 12 inches deep and <br /> relatively well-graded with stone size varying from 2 to 12 inches. <br /> MAINTENANCE AND OPERATIONS PLAN <br /> Maintenance and operations tasks and descriptions are included as Figure 8. <br /> SOURCE CONTROL PLAN <br /> As a temporary parking facility,the project does not propose process water or waste handling that <br /> would require source control BMPs. BMPs are implemented only for rain event runoff. The size of the <br /> temporary parking lot makes it cost-ineffective to cover with a roof or awning. Source control BMPs <br /> used include curbing along the south side of the parking facility and fine grading to ensure that runoff <br /> Storm Drainage Design <br /> 7 <br /> Utility Plant Expanded Parking Facility, Everett,Washington <br />