Laserfiche WebLink
Panera Bread Stormwater Management Report Everett,WA <br /> Table of Contents <br /> Section Page <br /> Executive Summary 3 <br /> Stormwater Management Report 4 <br /> 1. Project Overview 4 <br /> a. Existing Condition <br /> b. Soils Conditions <br /> c. Wells, Septic Tanks and Fuel Tanks <br /> d. Proposed Development <br /> Figure 1.Site Location 7 <br /> Figure 2. Site Survey 8 <br /> 2. Conditions and Requirements Summary 9 <br /> 3. Stormwater Site Plan 11 <br /> I. Project Description 11 <br /> II. Site Assessment 11 <br /> III. Site Development Plan w/On-Site Stormwater Management BMPs 11 <br /> IV. Construction Stormwater Pollution Prevention Plan 12 <br /> V. Source Control Plan 13 <br /> VI. Special Reports and/or Studies 17 <br /> VII.Other Permits 18 <br /> VIII. Permanent Stormwater Control Plan 18 <br /> A. Off-site Analysis <br /> B. Pre-Developed Hydrology <br /> C. Developed Hydrology <br /> D. Stormwater Flow Control Plan <br /> E. Stormwater Treatment <br /> F. BMPs and Facilities <br /> G. Conveyance Analysis <br /> H. Maintenance and Operation Plan <br /> Core States Group Page 2 <br />