Laserfiche WebLink
KA No.092-12004 <br /> August 24,2012 <br /> Page No. 10 <br /> should not be allowed. In addition, adequate ventilation of the structure is recommended to reduce the <br /> accumulation of interior moisture. <br /> Temporary Excavations <br /> The on site soils have variable cohesion strengths,therefore the safe angles to which these materials may <br /> be cut for temporary excavations is limited, as the soils may be prone to caving and slope failures in <br /> temporary excavations deeper than 4 feet. Temporary excavations in the medium dense native soils <br /> should be sloped no steeper than 1H:1 V(horizontal to vertical)where room permits. <br /> All temporary cuts should be in accordance with Washington Administrative Code (WAC) Part N, <br /> Excavation, Trenching, and Shoring. The temporary slope cuts should be visually inspected daily by a <br /> qualified person during construction work activities and the results of the inspections should be included <br /> in daily reports. The contractor is responsible for maintaining the stability of the temporary cut slopes <br /> and minimizing slope erosion during construction. The temporary cut slopes should be covered with <br /> plastic sheeting to help minimize erosion during wet weather and the slopes should be closely monitored <br /> until the permanent retaining systems are complete. Materials should not be stored and equipment <br /> operated within 10 feet of the top of any temporary cut slope. <br /> A Krazan & Associates geologist or geotechnical engineer should observe, at least periodically, the <br /> temporary cut slopes during the excavation work. The reason for this is that all soil conditions may not <br /> be fully delineated by the limited sampling of the site from the geotechnical explorations. In the case of <br /> temporary slope cuts, the existing soil conditions may not be fully revealed until the excavation work <br /> exposes the soil. Typically, as excavation work progresses the maximum inclination of the temporary <br /> slope will need to be evaluated by the geotechnical engineer so that supplemental recommendations can <br /> be made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to <br /> be adjustable, to deal with unanticipated conditions, so that the project can proceed smoothly and <br /> required deadlines can be met. If any variations or undesirable conditions are encountered during <br /> construction, Krazan & Associates should be notified so that supplemental recommendations can be <br /> made. <br /> Structural Fill <br /> Fill placed beneath foundations, pavement, or other settlement-sensitive structures should be placed as <br /> structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and <br /> standards, and is monitored by an experienced geotechnical professional. Field monitoring procedures <br /> would include the performance of a representative number of in-place density tests to document the <br /> attainment of the desired degree of relative compaction. The area to receive the fill should be suitably <br /> prepared as described in the Site Preparation subsection of this report prior to beginning fill placement. <br /> Typically, imported structural fill material should consist of well-graded gravel or sand and gravel <br /> mixture with a maximum grain size of 3 inches and less than 5 percent fines (material passing the U.S. <br /> Krazan&Associates,Inc. <br /> Eleven Offices Serving The Western United States <br />