Laserfiche WebLink
Bob's Burger and Brew <br /> City of Everett,WA Stormwater Site Plan December 21,2009 <br /> Additionally since the new system will not increase the flow rates, the system <br /> should not have any negative downstream impacts. <br /> Analysis and Design of Required Source Control BMPs <br /> I The design intends to allow a majority of runoff from non-polluted generating <br /> surfaces to mix with runoff from the pollution generating surfaces. The exception to <br /> this is the roof drains. The roof drains will tie directly to the underground <br /> conveyance system and will not pass though the Filterra Units. The roof drains will <br /> be 6" diameter pipe. <br /> No additional source control BMPs are proposed. <br /> Special Reports and Studies <br /> There are three notable reports that should be included along with this report. They <br /> are the geotechnical report, prepared by Geotech Consultants dated November 18, <br /> 2009 and the existing drainage and detention calculations, both prepared by <br /> Barghausen dated October 1983 and March 1984 respectively, for the existing <br /> stormwater facility for the Haggen's site. These reports have been included as <br /> Appendices D and E respectively. <br /> Other Permits <br /> The-following permits will be required for construction of-the proposed restaurant. <br /> Department of Ecology, Construction <br /> on Stormwater Permit <br /> NPDES Permit <br /> Building Permit <br /> Miscellaneous Forms and Worksheets <br /> N/A, No additional forms and worksheets are known for this site. <br /> I <br /> PACLAND Project#30182002 Page S 7 <br /> I <br />