My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1606 SE EVERETT MALL WAY ANTHEM SELF STORAGE 2025-07-25
>
Address Records
>
SE EVERETT MALL WAY
>
1606
>
ANTHEM SELF STORAGE
>
1606 SE EVERETT MALL WAY ANTHEM SELF STORAGE 2025-07-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2025 2:44:55 PM
Creation date
7/25/2025 2:42:55 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1606
Tenant Name
ANTHEM SELF STORAGE
Notes
DRAINAGE REPORT AND STORMWATER POLLUTION PREVENTION PLAN (SWPPP)
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Critical areas: See this report above all sections. <br /> Soil: See this report above in section Existing Conditions. <br /> ' Potential erosionproblem areas: All areas of exposed disturbed soil arepotential problem <br /> p <br /> areas. This site has no unusual conditions requiring extraordinary measures beyond industry best <br /> ' management practices. <br /> Construction phasing: Phasing is not proposed. The construction sequence is described on <br /> Sheet SP 1.0 of the construction plans. <br /> Construction schedule: As this project is still in the approval and permitting process the <br /> schedule has not been established. The work likely will begin sometime in the spring or summer <br /> of 2014. <br /> Financial/ownership responsibilities: The current owner/applicant is Anthem Self Storage (EM) <br /> LLC.,whose contact information is provided on the cover of this report and on Sheet SP1.0 of <br /> ' the construction plans. The owner or his representative is responsible for selecting a contractor, <br /> who in turn is responsible for ensuring that the work is done in accordance with the approved <br /> plans to the satisfaction of the owner and the city inspector. Environmental bonding <br /> ' requirements, if any, will be administered by the City of Everett in accordance with applicable <br /> codes and agreements. <br /> ' Engineering calculations: See the appendix of this report. <br /> Certified Erosion &Sediment Control Lead: The owner or contractor shall identify an on-call <br /> ' Certified Erosion& Sediment Control Lead(CESCL) for this project prior to commencing work. <br /> This individual will be qualified by having completed a certification program or"any equivalent <br /> training" (C.O.E. I1-2.2.1). The CESCL will not be selected until after the contractor is selected, <br /> ' as it maybe someone on the contractor's staff or a subcontracted position. Monitoring and <br /> reporting requirements will be discussed at the required pre-construction meeting with City of <br /> Everett staff. <br /> I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.