techniques may include but not limited to mulching, plastic sheeting or hydroseeding, <br /> notes have been added to the plan regarding protection for the stock pile area if <br /> necessary. <br /> 6: Protect Slopes <br /> All slopes on site during construction are required to be protected with mulch or other <br /> means as specified in the construction sequence. <br /> 7: Protect Drain Inlets <br /> All new and existing catch basins on or directly adjacent to the site will have inlet filters <br /> installed to protect the conveyance system. <br /> 8: Stabilize Channels and Outlets <br /> No new channels or outlets to surface facilities are proposed for this project. <br /> 9: Control Pollutants <br /> No outside chemicals are expected to be necessary for the construction of this project. <br /> All vehicles working on and around the site would need to meet the State requirements <br /> for emissions. <br /> 10: Control DeWatering <br /> No dewatering is expected for this project. However, if during construction it is found to <br /> be necessary Baker Tanks may be brought in and water can be pumped to the tanks for <br /> settling prior to release. <br /> 11: Maintain BMPs <br /> The construction supervisor will be responsible for maintaining all BMPs during <br /> construction and working with the County to relocate or add BMPs as necessary as site <br /> conditions change. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the County Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to <br /> control the quality of stormwater discharges. <br /> Whenever inspection and/or monitoring reveals that the BMPs identified in the <br /> Construction SWPPP are inadequate, due to the actual discharge of or potential to <br /> discharge a significant amount of any pollutant, appropriate BMPs or design changes <br /> shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP'shall be retained on-site or within reasonable access to the <br /> site. <br /> Rodland Toyota 12-0412 <br /> May 2012 Page-15 <br />