Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 1.0 Introduction <br /> This Stormwater Pollution Prevention Plan(SWPPP)has been prepared as part of the NPDES <br /> stormwater permit requirements for the Reserve at Everett construction project in Everett, <br /> Washington. The site is located at 8800 Evergreen Way. The existing site is a 2.38-acre lot with <br /> small amounts of existing site concrete and asphalt. The proposed development consists of the <br /> construction of a new senior apartment building complex that will include 177 units, a parking <br /> lot, a large patio, a stormwater detention facility, and landscaping. <br /> Construction activities will include demolition, excavation, grading, relocation/removal/addition <br /> of onsite services/utilities, and construction of a four-story wood frame building. The purpose of <br /> this SWPPP is to describe the proposed construction activities and all temporary and permanent <br /> erosion and sediment control (TESC)measures,pollution prevention measures, <br /> inspection/monitoring activities, and recordkeeping that will be implemented during the <br /> proposed construction project. The objectives of the SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs)to prevent erosion and • <br /> sedimentation, and to identify,reduce, eliminate or prevent stormwater <br /> contamination and water pollution from construction activity. <br /> 2. Prevent violations of surface water quality, ground water quality, or <br /> sediment management standards. <br /> 3. Prevent, during the construction phase, adverse water quality impacts <br /> including impacts on beneficial uses of the receiving water by controlling <br /> peak flow rates and volumes of stormwater runoff at the Permittee's <br /> outfalls and downstream of the outfalls. <br /> This SWPPP was prepared using the Ecology SWPPP Template downloaded from the Ecology <br /> website on May 10, 2013. This SWPPP was prepared based on the requirements set forth in the <br /> Construction Stormwater General Permit, Stormwater Management Manual for Western <br /> Washington (SWMMWW 2005). The report is divided into seven main sections with several <br /> appendices that include stormwater related reference materials. The topics presented in the each <br /> of the main sections are: <br /> • Section 1 —INTRODUCTION. This section provides a summary <br /> description of the project, and the organization of the SWPPP document. <br /> • Section 2— SITE DESCRIPTION. This section provides a detailed <br /> description of the existing site conditions, proposed construction activities, <br /> and calculated stormwater flow rates for existing conditions and post— <br /> construction conditions. <br /> 1 <br />