Laserfiche WebLink
Stormwater Pollution Prevention Plan <br /> 7.1.4 Updating the SWPPP <br /> In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP will be <br /> modified if the SWPPP is ineffective in eliminating or significantly minimizing pollutants in <br /> stormwater discharges from the site or there has been a change in design, construction, operation, <br /> or maintenance at the site that has a significant effect on the discharge, or potential for discharge, <br /> of pollutants to the waters of the State. The SWPPP will be modified within seven days of <br /> determination based on inspection(s) that additional or modified BMPs are necessary to correct <br /> problems identified, and an updated timeline for BMP implementation will be prepared. <br /> • <br /> 7.2 Reporting <br /> 7.2.1 Discharge Monitoring Reports <br /> If cumulative soil disturbance is 5 acres or larger: Discharge Monitoring Reports (DMRs)will be <br /> submitted to Ecology monthly. Of there was no discharge during a given monitoring period, the <br /> Permittee shall submit the form as required, with the words "No discharge" entered in the place <br /> of monitoring results. The DMR due date is 15 days following the end of each month. <br /> 7.2.2 Notification of Noncompliance <br /> If any of the terms and conditions of the permit are not met, and it causes a threat to human <br /> health or the environment, the following steps will be taken in accordance with permit section <br /> S5.F: <br /> 1. Ecology will be immediately notified of the failure to comply. <br /> 2. Immediate action will be taken to control the noncompliance issue and to <br /> correct the problem. If applicable, sampling and analysis of any <br /> noncompliance will be repeated immediately and the results submitted to • <br /> Ecology within five (5) days of becoming aware of the violation. <br /> 3. A detailed written report describing the noncompliance will be submitted <br /> to Ecology within five (5) days, unless requested earlier by Ecology. <br /> 7.2.3 Permit Application and Changes <br /> In accordance with permit condition S2.A, a complete application form will be submitted to <br /> Ecology and the appropriate local jurisdiction(if applicable)to be covered by the General <br /> Permit. <br /> 24 <br />