Laserfiche WebLink
Stormwater Site Plan Report <br /> CG Project#13008.20 <br /> Chapter V — Source Control Plan <br /> Chapter V Summary: <br /> Narrative <br /> Activity Worksheet <br /> A1.3: Washing, Pressure Washing, and Steam Cleaning of Vehicles, Equipment, and Building <br /> Structures <br /> A3.2: Concrete Pouring, Concrete Cutting, and Asphalt Application at Temporary Sites. <br /> A3.6: Landscaping and Vegetation Management Activities <br /> A4.4:Storage of Solid Wastes and Food Wastes <br /> A5.2: Building Repair, Remodeling, and Construction <br /> A6.1:Dust Control at Disturbed Land Areas and Unpaved Roadways and Parking Lots <br /> A7.12:Maintenance of Stormwater Drainage and Treatment Facilities <br /> Source Control BMP Descriptions <br /> The proposed work includes concrete/asphalt application and the construction of a new <br /> building.There are also several regular activities that will occur on the completed site that will <br /> require Source Controls per the Stormwater Management Manual. <br /> A1.3 is checked to address washing activities that will occur on the site.Also checked on the list <br /> is Activity Code A3.2,which describes source control BMPs for the asphalt work on the <br /> proposed site. Landscaping and vegetation management will occur per A3.6. Storage of wastes <br /> is addressed by A4.4. Also checked is A5.2, which describes source controls for the building <br /> construction.Also included is A6.1, which discusses dust control during the site construction. <br /> Lastly, A7.12 is included, which discusses maintenance of the various Stormwater facilities. <br /> Volume IV, Chapter 4 of the Stormwater Management Manual is included in this section. This <br /> chapter lists the various Source Control BMPs referenced in the Activity Codes. <br /> • <br /> 250 4th Ave South, Suite 200 <br /> ENGINEERING Edmonds, WA 98020 <br />