Laserfiche WebLink
Q <br />rn <br />0 <br />77 <br />CV <br />O <br />CV <br />N <br />L: <br />X <br />a� <br />co <br />I <br />Z <br />I <br />C) <br />I <br />U) <br />L <br />E <br />O <br />U <br />L <br />O <br />LL <br />ti <br />N <br />e0 <br />yr <br />E <br />U <br />O <br />0 <br />X <br />g <br />L <br />A <br />0 <br />80 <br />a <br />O <br />O <br />J <br />LL <br />U) <br />z <br />O <br />w <br />J <br />w <br />ry <br />w <br />0- <br />Of <br />O <br />O <br />J <br />LL <br />O <br />H <br />ry <br />O <br />O <br />J <br />LL <br />TOP PLATE <br />'AL ROOF/CEILING ASSEMBLY - 1 HOUR <br />POSITION SHINGLE ROOFING <br />= UNDERLAYMENT, ICE & WATER SHIELD 00 <br />= SHEATHING PER STRUCTURAL o <br />MANUFACTURED ROOF TRUSSES @ 24" O.1bo <br />BATT INSULATION <br />'ESILIENT CHANNELS @ 24" O.C. <br />YPE W GWB, PAINTED @ BOTTOM FACE OILu <br />Hc�tMBLY = <br />w <br />Q <br />J <br />d <br />TOP OF GYPCRETE/ LVL 6 <br />FIRST LAYER OF GWB TO TOP <br />PLATE (TYP.) <br />NOTE: LEVEL 5 NOT SHOWN <br />7D <br />7D <br />M <br />TYPICAL FLOOR/CEILING ASSEMBLY - 1 HOUR <br />FLOOR FINISH MATERIAL 0") <br />GYPCRETE TOPPING <br />SOUND CONTROL MAT @ HARD FINISH AREAS O <br />FLOOR SHEATHING PER STRUCTURAL LL <br />FLOOR FRAMING PER STRUCTURAL 0 <br />SOUND CONTROL INSULATION <br />1/2" RESILIENT CHANNELS @ 24" O.C. O <br />5/8" TYPE W GWB, PAINTED @ BOTTOM FACE OF JO <br />ASSEMBLY <br />TOP OF GYPCRETE/ LVL 3 <br />it <br />M <br />O <br />TYPICAL DEMISING WALL ASSEMBLY - 1 HOUR of <br />5/8" TYPE W GWB, PAINTED @ FACE OF STUD O <br />DOUBLE -STUD WALL FRAMING PER STRUCTURAL <br />1"AIR GAP <br />3 1/2" BATT INSULATION IN BOTH STUD CAVITIES 0 <br />5/8" TYPE 'X' GWB PAINTED @ FACE OF STUD 0 <br />O <br />J <br />LL <br />2B <br />TOP OF CONCRETE/LVL 2 <br />a <br />d <br />TYPICAL SLAB ON GRADE ASSEMBLY <br />CONCRETE SEALER <br />4" CONCRETE SLAB PER STRUCTURAL <br />BARRIER <br />LLARY BREAK LAYER PER <br />:CHNICAL REPORT <br />T.O.C. <br />M <br />cV <br />I A500 <br />�l <br />ATTIC— - — <br />NO STORAGE <br />PROVIDE DRY <br />SPRINKLER <br />SYSTEM <br />CATWALK 1 <br />� <br />7G1 7C <br />TYPICAL ROOF/CEILING ASSEMBLY - 1 HOUR <br />COMPOSITION SHINGLE ROOFING <br />ROOF UNDERLAYMENT, ICE & WATER SHIELD <br />ROOF SHEATHING PER STRUCTURAL <br />PRE -MANUFACTURED ROOF TRUSSES @ 24" O.0 <br />R-49 BATT INSULATION <br />1/2" RESILIENT CHANNELS @ 24" O.C. <br />5/8" TYPE W GWB, PAINTED @ BOTTOM FACE OF <br />ASSEMBLY <br />TOP OF PLATE <br />0 <br />0 <br />80 <br />C7 <br />w <br />w <br />Q <br />J <br />d <br />TOP OF SUBFLOOR <br />TOP OF SUBFLOOR <br />M <br />'YPICAL FLOOR/CEILING ASSEMBLY - <br />1 HOUR] <br />LOOR FINISH MATERIAL <br />'YPCRETE TOPPING <br />O <br />;OUND CONTROL MAT @ HARD FINISH AREAS- <br />LOOR SHEATHING PER STRUCTURAL <br />O <br />LOOR FRAMING PER STRUCTURAL <br />O <br />;OUND CONTROL INSULATION <br />/2" RESILIENT CHANNELS @ 24" O.C. <br />/8" TYPE W GWB, PAINTED @ BOTTOM FACE OF <br />ASSEMBLY <br />TOP OF SUBFLOOR <br />it <br />M <br />O <br />Of <br />O <br />O <br />J <br />LL <br />0 <br />Of <br />O <br />O <br />J <br />LL <br />fOP OF SUBFLOOR <br />YPICAL SLAB ON GRADE ASSEMBLY <br />ONCRETE SEALER c i <br />'CONCRETE SLAB PER STRUCTURAL N <br />APOR BARRIER a, <br />'CAPILLARY BREAK LAYER PER <br />EOTECHNICAL REPORT <br />T.O.C. <br />I A500 <br />ATTIC— <br />NOSTORAGESTORAGE <br />PROVIDE DRY <br />SPRINKLER <br />SYSTEM <br />I <br />7� I <br />G1 I 7C <br />TYPICAL ROOF/CEILING ASSEMBLY - 1 HOUR <br />COMPOSITION SHINGLE ROOFING <br />ROOF UNDERLAYMENT, ICE & WATER SHIELD <br />ROOF SHEATHING PER STRUCTURAL <br />PRE -MANUFACTURED ROOF TRUSSES @ 24" O.0 <br />R-49 BATT INSULATION <br />1/2" RESILIENT CHANNELS @ 24" O.C. <br />5/8" TYPE W GWB, PAINTED @ BOTTOM FACE OF <br />ASSEMBLY <br />TOP OF PLATE <br />fOP OF SUBFLOOR <br />TOP OF SUBFLOOR <br />'YPICAL FLOOR/CEILING ASSEMBLY - 1 HOUR <br />LOOR FINISH MATERIAL <br />)YPCRETE TOPPING <br />;OUND CONTROL MAT @ HARD FINISH AREAS <br />LOOR SHEATHING PER STRUCTURAL <br />LOOR FRAMING PER STRUCTURAL <br />;OUND CONTROL INSULATION <br />/2" RESILIENT CHANNELS @ 24" O.C. <br />/8" TYPE W GWB, PAINTED @ BOTTOM FACE OF <br />SSEM BLY <br />TOP OF SUBFLOOR <br />fOP OF SUBFLOOR <br />ONCRETE SEALER <br />'CONCRETE SLAB PER STRUCTURAL <br />APOR BARRIER <br />'CAPILLARY BREAK LAYER PER <br />EOTECHNICAL REPORT <br />T.O.C. <br />\I <br />OHNSON BRAUNDINC. <br />15200 52nd Ave. South <br />Suite 300 <br />Seattle, WA 98188 <br />Phone 206.766.8300 <br />www.johnsonbraund.com <br />ARCHITECTURE <br />INTERIOR DESIGN <br />Greg L. Allwine, <br />Jeffrey A. Williams, <br />8556 <br />REGISTERED <br />ARCHITECT <br />eFFREY THUR WILLIAM WASHINGTON <br />STAMP <br />Q <br />0M <br />�D <br />a <br />U) <br />0 <br />U) <br />11� <br />w <br />p <br />w <br />a <br />H <br />w <br />0 <br />0 <br />Q <br />LU <br />Q <br />U) <br />p <br />0 <br />C <br />O <br />Q. <br />V <br />N <br />d <br />0 <br />d <br />a <br />0 <br />d <br />0 <br />w <br />0 <br />a <br />Uj <br />w <br />0 <br />r <br />z <br />Q <br />z <br />0 <br />w <br />U) <br />0 <br />w <br />V� <br />p <br />w <br />p <br />z <br />w <br />F <br />z <br />W <br />F <br />z <br />w <br />Q <br />�w <br />sz = <br />Q~ <br />b <br />Ez <br />C� <br />z <br />Q\ <br />M <br />_ Q <br />w m <br />N <br />0 <br />aa) rn <br />a)Q <br />F o <br />L <br />OT <br />w0 <br />w, <br />W <br />> <br />Lu <br />O <br />cV <br />� <br />a_ <br />0 <br />co w <br />z <br />Q U cn o <br />aQ <br />LU <br />UJJcnO <br />_ <br />00 <br />wF <br />�w <br />LL n Q <br />z> <br />L <br />o <br />Q L E u <br />a z <br />Q <br />WC) <br />o C) <br />w <br />z L O (1)U) <br />7 <br />LU <br />- <br />11 <br />co <br />O LOL pp <br />a_ <br />PROJECT #: <br />1827 <br />DRAWN BY: <br />AT, ST <br />CHECKED BY: <br />ST <br />WALL SECTIONS <br />A462 <br />PERMIT SET 10/09/2020 <br />L.LI <br />Q <br />z <br />w <br />J_ <br />LL <br />1 <br />1/2" = 1'-0" <br />GARAGE <br />PS <br />1/2" = 1'-0" <br />GARAGE <br />