Laserfiche WebLink
VI. REQUIRED SOURCE CONTROL BMP'S <br /> See Appendix B - Source Control BMP's. <br /> VII. SPECIAL REPORTS & STUDIES <br /> No special reports or studies are required for the project. <br /> VIII. OTHER PERMITS <br /> A separate Department of Ecology General Stormwater permit will be required during the site <br /> construction phase since the since is greater than 1 acres of disturbed area. <br /> IX. MISCELLANEOUS FORMS AND WORKSHEETS <br /> The Seasonal Limitations Rating Checklist is attached; seasonal restrictions do not apply. <br /> We do not know of any other required forms or worksheets. <br /> X. MAINTENANCE AND OPERATION REQUIREMENTS <br /> Refer to Appendix A. <br />