Laserfiche WebLink
Introduction: <br /> The proposed RiteAid #5231 requires compliance with the current City of Everett <br /> drainage code. These following guidelines represent the maintenance requirements <br /> for the existing and proposed on-site drainage facilities. These requirements shall be <br /> performed by the property owner or maintenance service in accordance with current <br /> City codes. <br /> Plan Goal <br /> The specific purpose for the storm water facility is to minimize pollution that is typically <br /> associated with modern development. In general, pollution from motor vehicles and <br /> pollution generated from erosion. Attached to this narrative is a maintenance manual, <br /> which offers guidelines to the owner for storm water facility maintenance. <br /> On-Site Stormwater Facility Maintenance Requirements <br /> Regular inspections of the drainage facilities should be carried out twice per year, in <br /> the spring and fall. The responsible party should keep records of these inspections <br /> available for review by the City. Additional inspections may be required after severe <br /> seasonal storms. <br /> Routine maintenance of the site will include mowing, care of landscaping and the <br /> removal of trash and debris from the drainage system. The parking lots and driveways <br /> should be kept clean and in repair. Events such as major storms or heavy winds will <br /> require immediate inspections for damages. <br /> The following is a list of the on-site storm drainage facilities and their function. Also <br /> attached are the required maintenance requirements for these facilities. <br /> • Control Structure - stormwater discharge restrictor assembly <br /> • Catch Basins - collect surface drainage <br /> • Conveyance Pipes - convey catch basin and roof drainage <br /> • Grounds/ Landscaping - prevent erosion of unpaved areas <br /> • Stormfilter Treatment MH —provide water quality treatment <br /> • Stormceptor Pretreatment MH— provide pretreatment prior to Stormfilter <br /> Responsible Organization: <br /> Nicholson Development Properties <br /> 2333 Carillon Point <br /> Kirkland, WA 98033 <br /> Contact: Daniel Taylor <br /> Phone: (425) 827-7499 <br />