Laserfiche WebLink
0.0573 1 7 700 Fail <br /> 0.0578 1 7 700 Fail <br /> 0.0582 1 7 700 Fail <br /> 0.0587 1 7 700 Fail <br /> 0.0592 1 7 700 Fail <br /> 0.0597 1 7 700 Fail <br /> The development has an increase in flow durations <br /> from 1/2 predeveloped 2 year flow to the 2 year flow <br /> or more than a 10% increase from the 2 year to the 50 <br /> year flow. <br /> Water Quality BMP Flow and Volume for POC 1. <br /> On-line facility volume: 0 acre-feet <br /> On-line facility target flow: 0 cfs. <br /> Adjusted for 15 min: 0 cfs. <br /> Off-line facility target flow: 0 cfs. <br /> Adjusted for 15 min: 0 cfs. <br /> Perind and Impind Changes <br /> No changes have been made. <br /> This program and accompanying documentation is provided 'as-is' without warranty of any <br /> kind. The entire risk regarding the performance and results of this program is assumed <br /> by the user. Clear Creek Solutions and the Washington State Department of Ecology <br /> disclaims all warranties, either expressed or implied, including but not limited to <br /> implied warranties -of program and accompanying documentation. In no event shall Clear <br /> Creek Solutions and/or the Washington State Department of Ecology be liable for any <br /> damages whatsoever (including without limitation to damages for loss of business profits, <br /> loss of business information, business interruption, and the like) arising out of the use <br /> of, or inability to use this program even if Clear Creek Solutions or the Washington <br /> State Department of Ecology has been advised of the possibility of such damages. <br />