My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3408 ROCKEFELLER AVE 2025-08-15
>
Address Records
>
ROCKEFELLER AVE
>
3408
>
3408 ROCKEFELLER AVE 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 9:47:50 AM
Creation date
7/28/2025 9:47:50 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3408
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: U2501-018 Description: OPEN TRENCH REPLACEMENT FOR THE SIDE SEWER <br /> Applied: 1/21/2025 Approved: 1/21/2025 Site Address: 3408 ROCKEFELLER AVE <br /> Issued: 1/21/2025 Finaled: City,State Zip Code: EVERETT,WA 98201 <br /> Status: PERMIT ISSUED-ONLINE Applicant:SEATOWN (CONST) ELECTRIC HTG&AIR LLC <br /> Parent Permit: Owner: LUKOMSKI OLIVIA M <br /> Parent Project: Contractor:SEATOWN (CONST) ELECTRIC HTG&AIR LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 1/24/2025 1/24/2025 UTIL 02-SIDE Andy Erickson NOT READY eTRAKiT Inspection Request <br /> SEWER REPAIR <br /> Notes: <br /> 1/22/2025 9:46 AM SEATOWN(CONST)ELECTRIC HTG&AIR LLC <br /> Contact Name:Rhi Whitney <br /> Site Address:3408 ROCKEFELLER AVE <br /> Phone:4254460638 <br /> e-Mail:PERMITS@SEATOWNSERVICES.COM <br /> Will be ready 1/27/25 <br /> UTIL 03-SIDE <br /> 11:00 APPRVD-PERMIT <br /> 1/27/2025 1/27/2025 AM SEWER Andy Erickson FINAL eTRAKiT Inspection Request <br /> ALTERATION <br /> Notes: <br /> 1/27/2025 5:52 AM SEATOWN(CONST)ELECTRIC HTG&AIR LLC <br /> Contact Name:Rhi Whitney <br /> Site Address:3408 ROCKEFELLER AVE <br /> Phone:4254460638 <br /> e-Mail:PERMITS@SEATOWNSERVICES.COM <br /> Replaced side sewer with connection for future DADU and 6"from connection point downstream. 4"clay pipe on COE side of line,necked new 6"down <br /> to 4"and connected to COE stub. <br /> I <br /> Printed:Tuesday,28 January,2025 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.