Laserfiche WebLink
Project Ove <br /> rview <br /> erview <br /> IThe Valley Electric Building project consists of a 34,000 square foot building on Lot `L' in the <br /> Mountain View Business Park. Lot `L' is a 3-acre lot along Merrill Creek Parkway and is <br /> I adjacent to the Associated Boulevard Detention Pond, which will provide detention for the site: <br /> Stormwater from the parking areas and access roads will be treated in a StormfilterTM vault. <br /> Stormwater from the roof will bypass the StormfilterTM Vault. Off-site drainage from the <br /> property south of the site will be collected in a sedimentation pond and routed around the Valley <br /> Electric site to the Associated Boulevard Detention Pond. <br /> t <br /> Vicinity Map <br /> S>1;9 <br /> S <br /> r <br /> .5e, , >s'iy 23R0 A vE W ST <br /> S9ly s4, <br /> sr <br /> PROJECT <br /> 60TH ST SW SITE <br /> 1 w 'REEK Pi< <br /> SEAWAY �` <br /> BC Vp W <br /> _ SEAWNAY O <br /> O? <br /> all* 97 <br /> Valley Electric Building August 4,2003 <br /> ' Hydraulics Report -1 Revised August 20,2003 <br /> Reid iddleton <br />