My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1019 PACIFIC AVE 2025-07-28
>
Address Records
>
PACIFIC AVE
>
1019
>
1019 PACIFIC AVE 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 10:26:11 AM
Creation date
7/28/2025 10:25:44 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
1019
Notes
DRAINAGE REPORT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM REQUIREMENT#3: SOURCE CONTROL OF POLLUTANTS <br /> Since this project is located within the combined storm/sewer basin for the City of Everett, <br /> interim Public Works Policy#2-11 states that projects within the combined basin are <br /> exempt from runoff treatment. <br /> MINIMUM REQUIREMENT#4: PRESERVATION OF NATURAL DRAINAGE SYSTEMS <br /> AND OUTFALLS <br /> All of the runoff from the existing site is tributary to the combined storm/sewer system and <br /> that will remain the case after this project is completed. <br /> MINIMUM REQUIREMENT#5: ON-SITE STORMWATER MANAGEMENT <br /> A grass lined swale has been designed along the north side of the parking for this project <br /> to collect, treat, retain and attenuate runoff from the proposed parking. In addition, five 6- <br /> inch rock check dams have been added to the swale to provide some ponding of runoff <br /> which will further attenuate flows and allow for absorption of runoff into the amended soils <br /> within the bottom and sides of the swale.. <br /> MINIMUM REQUIREMENT#6: RUNOFF TREATMENT <br /> Since this project is located within the combined storm/sewer basin for the City of Everett, <br /> interim Public Works Policy#2-11 states that projects within the combined basin are <br /> exempt from runoff treatment. <br /> MINIMUM REQUIREMENT#7: FLOW CONTROL <br /> As noted previously this project is located within the combined storm/sewer basin and <br /> City of Everett Interim Policy#2-11 applies. With regards to flow control this policy states <br /> that the existing conditions for the site shall be used in the calculation of site runoff. <br /> There for the existing SFR and driveway which were recently removed along with the <br /> existing landscaping will be used to define the existing conditions. Refer to Section 6 for <br /> a detailed discussion. <br /> MINIMUM REQUIREMENT#8: WETLAND PROTECTION <br /> No wetlands exist in the downstream system for this project. <br /> MINIMUM REQUIREMENT#9: BASIN/WATERSHED PLANNING <br /> No existing Basin or Watershed plans were found that affect the area around this project. <br /> PSKC Nassau 12-0411 <br /> July 2012 Page-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.