My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1130 RAINIER AVE Geotech Report 2025-07-28
>
Address Records
>
RAINIER AVE
>
1130
>
Geotech Report
>
1130 RAINIER AVE Geotech Report 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 10:41:26 AM
Creation date
7/28/2025 10:40:33 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
1130
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECH 13256 Northeast 20th Street,Suite 16 <br /> CONSULTANTS, INC. Bellevue,Washington 8005 <br /> (425)747-5618 FAX(425)747-8561 <br /> } <br /> May 16, 2012 <br /> JN 12080 <br /> Everett Housing Authority <br /> PO Box 1547 <br /> Everett, Washington 98206-1547 <br /> via email <br /> Attention: Bud Alkire <br /> Subject: Transmittal Letter—Geotechnical Engineering Study <br /> Proposed Pivotal Point Apartments <br /> 1110 Rainier Avenue <br /> Everett, Washington <br /> Dear Mr. Alkire: <br /> We are pleased to present this geotechnical engineering report for the proposed Pivotal Point <br /> Apartments project to be constructed in Everett, Washington. The scope of our services consisted <br /> of exploring site surface and subsurface conditions, and then developing this report to provide <br /> recommendations for general earthwork and design criteria for foundations and retaining walls. <br /> This work was authorized by your acceptance of our proposal, P-8245, dated October 15, 2011. <br /> The attached report contains a discussion of the study and our recommendations. Please contact <br /> us if there are any questions regarding this report, or for further assistance during the design and <br /> construction phases of this project. <br /> Respectfully submitted, <br /> GE ULT NTS, INC. <br /> ar , E. <br /> P mcipal <br /> cc: Common Ground—Kym Haley <br /> via email to: KymH@commongroundwa.org <br /> DRW: jyb <br /> { <br /> GEOTECH CONSULTANTS,INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.