Laserfiche WebLink
1 <br /> ' VI. ANALYSIS AND DESIGN OF REQUIRED SOURCE CONTROL <br /> The proposed project includes paving and installation of a new drainage system. According to <br /> the City of Everett Stormwater Management Manual, Volume IV—Source Control, Chapter 3, <br /> "Selection of Operation and Structural Source Control BMPs,"the following Source Control <br /> ' BMPs are identified as appropriate for the project: <br /> BMP A1.3 Washing, Pressure Washing, and Steam Cleaning of <br /> Vehicles/Equipment/Building Structures. <br /> BMP A2.2 Fueling at Dedicated Stations. <br /> BMP A3.2 Concrete Pouring, Concrete Cutting, and Asphalt Application at <br /> Temporary Sites. <br /> BMP A3.6 Landscaping and Vegetation Management Activities. <br /> BMP A3.11 Application of Pesticides, Herbicides, Fungicides and Rodenticides for <br /> purposes other than landscaping. <br /> BMP A5.2 Building Repair, Remodeling, and Construction. <br /> BMP A7.10 Railroad Yards. <br /> tThe source control worksheet for the project is included in Appendix E, Source Control <br /> Worksheet. <br /> 1 <br /> 1 <br /> Regional Disposal Company June 11, 2014 <br /> Everett Transfer Facility Reid iddleton <br /> Stoiiiiwater Site Plan - 12 - <br /> I <br />