Laserfiche WebLink
i <br /> 1 <br /> IX. MAINTENANCE AND OPERATION REQUIREMENTS <br /> ' RDC is a lessee of the property and is responsible for the operation and maintenance of the storm <br /> drainage system. Reporting and inspection requirements for the site are outlined in the SWPPP <br /> prepared as part of the ISWGP. These requirements include monthly visual inspections and <br /> ' documentation, quarterly sampling and reporting, and preparation of an annual report. Quarterly <br /> and annual reports are submitted to DOE. <br /> In addition, the following operation and maintenance plan is proposed: <br /> A. Maintain temporary erosion and sediment control facilities during construction in <br /> ' accordance with the project SWPPP. <br /> B. Any deterioration threatening the structural integrity of the stormwater pretreatment <br /> facilities shall be repaired. <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> h:\doc\2Icp\13\006 reg disposal co-everett facility\reports\hydraulics report.doc\mkh <br /> Regional Disposal Company June 11, 2014 <br /> ' Everett Transfer Facility Reid iddleton <br /> Stormwater Site Plan - 15 - <br />