My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7808 BEVERLY BLVD 2025-08-15
>
Address Records
>
BEVERLY BLVD
>
7808
>
7808 BEVERLY BLVD 2025-08-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 11:19:50 AM
Creation date
7/28/2025 11:19:49 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7808
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: PW2411-010 Description: REMOVE CONCRETE AND REPLACE W/ASPHALT <br /> DRIVEWAY APRX 1950 SF <br /> Applied: 11/12/2024 Approved: 12/11/2024 Site Address: 7808 BEVERLY BLVD <br /> Issued: 12/11/2024 Finaled: City,State Zip Code: EVERETT,WA 98203-6713 <br /> Status: PERMIT ISSUED-ONLINE Applicant:JIREH CONSTRUCTION SERVICES <br /> Parent Permit: Owner: ECO MANUEL BALLADARES/SUSAN VICTORIA A <br /> Parent Project: Contractor:AREH CONSTRUCTION SERVICES <br /> Details: <br /> Scope of Work: 1.Concrete Driveway Removal:-Saw cut the existing concrete driveway to a depth of up to 4 inches over an area of <br /> approximately 1450 square feet.-Remove and dispose of the cut concrete. 2. Excavation of Soil and Soil-Based Materials:-Excavate <br /> up to 12 inches of soil and soil-based materials in an area of approximately 550 square feet,specifically in the transition area.-This <br /> area will be located from the city sidewalk and going 22 feet towards the back of the project site.-Excavate up to 4 inches of soil and <br /> soil-based materials in an area of approximately 1580 square feet. 3. Root Removal:-Identify and remove any roots present within <br /> the excavation areas where applicable. 4.Transition Area Work:-In the transition area,create a grade that slopes from the sidewalk <br /> level down to match the grade of the new concrete slab at the back,extending 22 feet from the sidewalk. S. Haul Away and Disposal: <br /> -Transport all demolished concrete,excavated soil,and other debris off-site.6.Gravel Base Installation:-Supply and install a new 5/8 <br /> minus gravel base to a thickness of 2-3 inches over the prepared area,approximately 1950 SQFT. 7.Asphalt Installation:-Supply and <br /> install new hot asphalt,class B,to a thickness of 3 inches over an area of approximately 1950 square feet. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 12/30/2024 12/30/2024 PW 02-ONSITE JIM KNAPPERT APPROVAL eTRAKiT Inspection Request <br /> PRECON <br /> Notes: <br /> 12/13/2024 12:51 PM JIREH CONSTRUCTION SERVICES <br /> Contact Name:JIREH CONSTRUCTION SERVICES <br /> Site Address:7808 BEVERLY BLVD <br /> Phone:4256261889 <br /> e-Mail:ricardo@jirehwa.com <br /> Job start on Friday. <br /> 1/3/2025 1/3/2025 PW 01-JOB START JIM KNAPPERT APPROVAL eTRAKiT Inspection Request <br /> NOTIFICATION <br /> Notes: <br /> 12/13/2024 12:51 PM JIREH CONSTRUCTION SERVICES <br /> Contact Name:JIREH CONSTRUCTION SERVICES <br /> Site Address:7808 BEVERLY BLVD <br /> Phone:4256261889 <br /> e-Mail:ricardo@jirehwa.com <br /> I <br /> Printed: Friday, 10 January,2025 1 of 2 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.