Laserfiche WebLink
0dStep 2.1: Describe the key considerations for stormwater management during <br /> project construction (continued). <br /> Are any of the following Critical Areas present at the project site? <br /> Refer to MR#1, Step 1.1. <br /> Describe any special <br /> Present at the site? requirements or provisions for <br /> Critical area (Yes/No) working near or within this area <br /> Geologic hazards ❑Yes 0 No <br /> Wetlands ❑Yes 0 No <br /> Streambanks ❑Yes 0 No <br /> Other: ❑Yes 0 No <br /> Are there areas on the construction site that may have potential erosion problems? <br /> ❑Yes 0 No <br /> If yes, describe: <br /> Step 2.2: Select Construction BMPs to be used on your project. <br /> All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br /> during construction. Each of the 13 elements below contain a list of the most common BMPs accepted by <br /> the Washington State Department of Ecology(Ecology)for satisfying the element's requirement. For a <br /> complete selection of BMPs please see Volume II of Ecology's Stormwater Management Manual for Western <br /> Washington (SWMMWW). <br /> The SWPPP must consider all 13 Elements listed below. Select the BMPsthatwill be usedto <br /> satisfyeach requirement.All requirements must have at least one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits <br /> ❑ BMP C101: Preserving Natural Vegetation ❑ Other BMP per the SWMMWW: <br /> ❑ BMP C102: Buffer Zones <br /> 0 BMP C103: High-Visibility Fence ❑ Not applicable to my proposed project <br /> ❑ BMP C233: Silt Fence Explain: <br /> Element 2. Establish construction access <br /> ❑ BMP C105: Stabilized Construction Access ❑ Other BM per the SWMMWW: <br /> ❑ BMP C106:Wheel Wash <br /> F] BMP C107: Construction Road/Parking Area ❑ Not applicable to my proposed project <br /> Stabilization Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan/Report—Sept.2023 Page 12 of 40 <br />