Laserfiche WebLink
0 Step 2.3: Attach construction SWPPP drawings. <br /> Provide a Temporary Erosion and Sediment Control (TESC) plan for your project. <br /> ■ Show all BMPs selected above on your TESC Plan. <br /> ■ See Volume 2 of the City's Design & Construction Standards and refer to drawing#103 <br /> (TESC Plan Example), available at: everettwa.gov/DocumentCenter/View/7040 <br /> ■ For small non-engineered projects, a sketch of this information can be drawn <br /> using the drawing and labeling tools on Map Everett. <br /> ■ Refer to Map Everett for readily available information: <br /> www.everettwa.gov/MapEverett <br /> ■ Refer to the Map Everett Viewer Instructions at the end of this template. <br /> 0 Step 2.4: Attach engineering calculations for construction BMPs (required for <br /> some projects). <br /> Provide engineering calculations for BMPs if needed including BMP C240: Sediment Trap and <br /> BMP C241: Sediment Pond (Temporary). <br /> Note: Construction SWPPPs that involve engineering calculations must also be <br /> prepared by or under the direction of a Washington State professional licensed <br /> engineer. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan/Report—Sept.2023 Page 16 of 40 <br />