Laserfiche WebLink
Calculate the Amendment Amount Needed <br /> Step Type Notes Calculation <br /> 7 Area of lawn of turf From Step 3 13,60Cft2 <br /> 8 Amendment quantity Multiply by conversion factor from 1.75 73.4 yd3 <br /> needed for lawn or inches to cubic yards(yd3): x 0.0054 <br /> turf <br /> 9 Areas of landscaping From Step 4 0 ft2 <br /> and planting beds <br /> 10 Amendment quantity Multiply by conversion factor from 3 0 yd3 <br /> needed for inches to cubic yards(yd3): x 0.0093 <br /> landscaping/planting <br /> beds <br /> 11 TOTAL AMENDMENT SUM of Step 8 and Step 10 Sum of Step 8 and Step 10 = <br /> QUANTITY NEEDED 73.4 yd3 <br /> SOURCES: Portion of total amendment quantity(from Step 11) <br /> 12 Purchased from off- 0 <br /> site sources <br /> 13 Stockpiled soil and 100 <br /> duff from on-site <br /> 14 Chipped and 0 <br /> stockpiled woody <br /> material from on-site <br /> 15 Imported topsoil 0 <br /> 16 CHECK Sum of Steps 12 through 15 should Sum of Steps 12 through 15 = <br /> equal100% 100 <br /> Calculate the Mulch Amount Needed <br /> 17 Area of landscaping From Step 4 0 ft2 <br /> and planting beds <br /> 18 Mulch quantity Multiply by conversion factor from 3 0 yd3 <br /> needed inches to cubic yards(yd3):x 0.0093 <br /> SOURCES: Portion of total mulch quantity(from Step 18) <br /> 19 Purchased from off- 0 <br /> site sources <br /> 20 Chipped and 0 <br /> stockpiled woody <br /> material from on-site <br /> 21 CHECK Sum of Steps 19 and 20 should total Sum of Step 19 and Step 20 = <br /> 100% 0 % <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan/Report—Sept.2023 Page 32 of 40 <br />