Laserfiche WebLink
3 Small Project Step 1.2/Pg. 9 a. In the second table for proposed discharge type, a. Sheet flow has been added to the EEC <br /> SSP/Report check "Yes"for"Other" and add sheet flow. table <br /> b. The answers to the last two questions were cut b. Answers have been shortened to <br /> off—please update. fit within the displayed area. <br /> 4 Small Project Step 1.3/Pg. 10 Check the box for"Drainage flow paths (location, The box has been checked. EEC <br /> SSP/Report direction of flow)". <br /> 5 Small Project Step 5.5/Pg. 28 Check "Worksheet 1—BMP Sizing Worksheets for The box has been checked. EEC <br /> SSP/Report Selected BMPs...". <br /> 6 Small Project Worksheet 1: Update Steps 1 and 2 in the BMP T5.13 table to match Steps 1 and 2 have been updated EEC <br /> SSP/Report Category 1— the Section 1 Basic Project Information summary on to match the Basic Project <br /> Lawn and pg. 2. Information summary. <br /> Landscaped <br /> Areas/Pg. 31 <br /> 7 Small Project Worksheet 1: Update the BMP T5.30: Full Dispersion section The total dispersion area has been EEC <br /> SSP/Report Category 3— calculation.The total impervious area is 4,996 sf so updated to 32,474 sf. <br /> Other Hard the total required dispersion area is 32,474 sf. <br /> Surfaces/Pg. 37 <br /> 8 Road Plan - The full dispersion area will need to be protected and Noted, thank you. EEC <br /> will require a recorded easement. <br /> Page 2 of 2 <br />